![OBO Bettermann EUK System Instructions Download Page 60](http://html1.mh-extra.com/html/obo-bettermann/euk/euk_system-instructions_3161374060.webp)
60 | EN
OBO Bettermann
Applying the screed
Fig. 23:
Applying the insulating edge strip
Fig. 24:
Position of the insulating edge strip
Note!
The overhang at the top socket frame must be fully underlaid with
screed. With cast screed and earth-moist screed, the screed must
be compacted under the top socket frame. In poured screed, com-
pactions, etc. may not create any cavities.
1. Lay the insulating edge strip (3‒5 mm) around the underfloor
junction boxes/underfloor device sockets
1
. In so doing, lay
the insulating edge strip up to and under the upper socket
edge.
2. Lay the separating layers, footfall sound insulation and heat
insulation.
3. Apply the screed.
Summary of Contents for EUK
Page 4: ......