
22
- EN -
Manual transmitter teach-in (Fig. K)
To be able to commission the Jumping Jet Rainbow Star set, set the manual transmitter
(8)
to the receiver
in the 12V Master control box
(5)
beforehand.
The receiver is equipped with a teach-in button
(39)
for the receiver to be set to the transmit signal of the
manual transmitter
(8)
.
1. Insert the pin
(9)
into the opening for the teach-in button
(39)
until you feel a resistance.
2. Briefly actuate the teach-in button
(39)
using the pin
(9)
. The green LED
(38)
lights up once.
3. Press any button of the manual transmitter
(8)
for at least 3 sec. The green LED
(38)
lights up once.
This completes the teaching in of the manual transmitter
(8)
to the receiver. Check the function of the
manual transmitter by actuating one of its buttons. The green LED
(38)
on the receiver must light up, the
‘water’ picture of the Jumping Jet Rainbow Star must change.
►
A maximum of 10 manual transmitters can be set to the receiver.
►
The manual transmitter has a maximum range of 80 m. Obstacles between transmitter and receiver,
a low battery in the manual transmitter, or electro-magnetic radiation of electrical equipment will impair
the range.
Deleting stored manual transmitters (Fig. K)
►
Actuate the teach-in button
(39)
using the pin
(9)
for at least 5 sec.
This deletes all manual transmitters stored in the receiver.
Setting the water jet (Fig. L - P)
The water jet of the Jumping Jet Rainbow Star has a parabolic shape. The jet height and range are
determined by the pump rating (flow rate) and the inclination angle of the Jumping Jet Rainbow Star set.
Jet height, jet range and water quality notably influence the quality of the water jet and the light emittance.
1. Undo the Allen screws
(36)
on both sides of the unit foot
(23)
using the Allan key
(18)
and bring the
Jumping Jet Rainbow Star
(1)
to the desired inclination angle.
The diagram (Fig. L) shows water jet shapes of the Jumping Jet Rainbow Star resulting from different
inclination angles.
2. Retighten the Allan screws
(36)
.
3. Set the pump flow rate.
The flow rate of electrically controlled pumps is set with the control unit (e.g. “In Scenio FM Master 3”),
the flow rate of pumps without control feature is set manually by means of a slide in the pump suction or
pressure area.
4. Align the jet diaphragm
(37)
in the hood of the Jumping
(1)
Jet such that the water jet passes the centre
of the jet diaphragm
(37) (Fig. O)
. Ensure that the water jet is not deflected by the water jet diaphragm
(37) (Fig. P)
.
5.
Prior to reaching into the water, disconnect the power supply to all units used in the water.
Slide
the jet diaphragm
(37)
to the optimum position
(Fig. O)
. Switch the units on again and check the position.
It might be necessary to repeat the process.
Summary of Contents for Jumping Jet Rainbow Star Add-On Set
Page 2: ...2 DE...
Page 3: ...3 DE...
Page 4: ...4 DE...
Page 5: ...5 DE...
Page 195: ...195 BG 9 Jumping Jet Rainbow Star 12V Maste Jumping Jet Rainbow Star OASE 10...
Page 205: ...205 UK 9 Jumping Jet Rainbow Star 12 Master Jumping Jet Rainbow Star OASE 10...
Page 215: ...215 RU 9 Jumping Jet Rainbow Star 12 Master Jumping Jet Rainbow Star OASE 10...
Page 219: ...219 CN 300 mm 1 m...
Page 223: ...223 CN 6 12V 5 1 4 5 1 5 1 4 2 5 6 1 2 2 3...
Page 225: ...225 CN 8 9 12V 10...
Page 231: ...231...
Page 232: ...10467 06 15 OASE GmbH www oase livingwater com Tecklenburger Stra e 161 48477 H rstel Germany...