![oaniso BCP Series Use And Installation Manual Download Page 15](http://html2.mh-extra.com/html/oaniso/bcp-series/bcp-series_use-and-installation-manual_3110250015.webp)
Installation instructions
Step-by-step installation instructions
(bottom entry wiring)
Step
3
lnstall the EV Charger to the mounting
plate
Align the side hole of EV charger to
the panel's side holes.
lnstallation
Use the 4pcs M6*8 screws to fix the
EV charger to the mounting plate as
picture shows (Screws torque 1.5NM-
2.0NM).
Step
4
Wiring
Note: Consult with your local electrician
or refer to your local code for proper
wire sizing appropriate for the currents
in your EV Charger.
Note: lt is the installer's responsibility
to identify whether additional grounding
is required to ensure that local regulations
are met.Grounding must be installed at
the power source and not at the cable
entry to the EV Charger.
As the picture at left shows, use the
screwdriver loosing the screws on the
EV charger cover. Wire the cable to the
according terminal.
Left hole position
Right hole
position
M6
*
8 bolts
Single
-
phase
wiring diagram
Three
-
phase
wiring diagram
Wiring diagram
Installation instructions
Step
-
by
-
step installation instructions
(
top entry wiring
)
Step
1
Position
The bottom of the
⑨
positioning
plate is 1.2 m away (recommended), if
the EV charger is installed close to
the edge of the wall, the positioning
plate should be more than 0.5 m
away from the edge of the wall.
Drilling pilot holes
Drilling the holes according to the
instruction on the Position template
for di
ff
erent installation and wiring
ways.
Step
2
Fix the wire box
Put the 8*40 flat head screws'anchoring
into the holes and use the screw driver
make the 2pcs 8*40 flat head screws to
fix the Wire box Mounting Template on
the wall.
wall
≥
0
.
5M
~
1
.
2M
Floor Level
Drill
Side of wall
Two points on
the top and
bottom of
position plate
screwdriver
PS
:
Hooks and
socketexcluded only for reference
Wire box
8
*
40
Expansion bolts
P-11
P-12