Voyager II
& Open Voyager II
Nitrox System
Nuvair
Page
26
www.nuvair.com
15.0 Producing Nitrox
The equipment you will be using to manufacture Nitrox (oxygen rich air) will expose you to
both low and high-pressure gas. Gas, even under moderate pressures, can cause extreme
bodily harm. Never allow any gas stream to be directed at any part of your body.
15.1 Flow to Membrane and Setting Proper Pressure
1) Verify that Oxygen Analyzer calibration is
complete, LP compressor is Off, and Regulator
is at minimum pressure setting.
2) Turn on HP Compressor. Allow pressure to
build up to about 2000 psi (140 bar), then crack
open the unconnected fill whip to maintain
1500-2000 psi (100-140 bar).
3) Verify that Permeate Oxygen Analyzer and Fill
Oxygen analyzer read 20.9%.
4) Turn on LP Compressor.
5) Turn BP Regulator Knob CW
6) Adjust feed air pressure to approximately 100 psi (7 bar) to activate Heater Pressure Switch.
Increase pressure by slowly turning the regulator Knob CW or decrease pressure by turning the
Knob CCW. The heater will not turn on until Membrane System is pressurized.
7) Check the Heater Temperature Gauge to verify air temperature rises and is between 105-120 ºF
(40-49 ºC).
Compressor Controls
On/Off
Switches
Feed Air
Pressure
Gauge
Heater
Temperature
Gauge
LP
Compressor
Oil
Temperature
Cabinet
Temperature
Gauge
LP Feed Air
Regulator
Adjustment
Knob
Summary of Contents for Open Voyager II
Page 1: ...User Manual Voyager II Open Voyager II Nitrox System Rev 03 19...
Page 17: ...Voyager II Open Voyager II Nitrox System Nuvair Page 17 www nuvair com...
Page 46: ...Voyager II Open Voyager II Nitrox System Nuvair Page 46 www nuvair com NOTES...
Page 47: ...Voyager II Open Voyager II Nitrox System Nuvair Page 47 www nuvair com...