WIRING
All wiring must comply with local codes and unit must be
properly grounded.
IMPORTANT:
Use wire suitable for 90°C.
Refer to Figure 4.
1. Run 120vAC house wiring (with ground) from wall switches to
fan location.
2. Insert and secure an approved box connector into wiring
entrance holes.
3. Pull wires through box connector and into junction box. Tighten
box connector.
4. Connect white wires from fan and light receptacles to white (neutral)
wire from the supply. Connect black wire to wire from fan switch.
Connect red wire to wire from light switch. Connect yellow wire to
wire from night light switch.
5. Connect the green (or bare) ground wire to the green ground lead.
POWER/BLOWER UNIT INSTALLATION
1.
Refer to Figure 1.
Place power/blower unit into housing so that
mounting plate's tabs insert into slots in housing.
2. Press other end of mounting plate down until it is firmly seated over
scroll and plug-in receptacles.
3. Secure mounting plate to housing with provided screw.
4. Insert motor plug into junction box receptacle.
COMPLETING INSTALLATION
1. Insert lamp plug into junction box receptacle and secure
reflector/grille assembly to motor frame with extension nut
provided. Turn extension nut until grille is flush to ceiling.
2. Install lamps 100 watt (maximum) for light, and 7 watt (maximum)
for night light.
3. Squeezing the mounting spring of the lens, insert springs into slots
on both sides of reflector.
NOTE: Spring should be inserted
through slots in grille only. Do not insert springs into tabs on
“A” housing; position grille so that springs extend into
recessed housing area.
4. Press lens flush against reflector/grille assembly.
INSTALLATION IN EXISTING CONSTRUCTION
PLANNING
Review “INSTALLATION IN A NEW CONSTRUCTION SITE” and
follow all instructions which apply to your installation.
LOCATION:
Locate fan between ceiling joists.
WIRING AND DUCTING:
Plan ducting wiring before proceeding with
installation.
Refer to Figure 4 for wiring and Figure 3 for ducting.
CAUTION: Check area above planned location to be sure that:
1. Ducting can be installed or that area is sufficient for proper venting.
2. Wiring can be run to the planned location.
3. No wiring or other obstruction might interfere with installation.
INSTALLATION
1. The fan must be mounted between ceiling joists. Decide where
you want to locate the fan, and then determine where the nearest
joists are.
Locating Joists –
Lightly tap the ceiling. A hollow sound means
no joist; a solid sound means a joist is present. To be sure you
have located a joist, drill a small hole (
1
/
16
") and probe into the
ceiling with a wire.
2. Locate the joists. Drill a starter hole in the ceiling between the
joists.
3. To exactly locate the edge of joist, saw a line from hole to joist.
4.
Refer to page 1.
Remove power/blower unit from housing.
5. Use the housing pan as a template to mark cutout: place pan
centered between joist and trace around pan.
6. Make cutout along outside of marked line.
7.
Refer to Figure 5.
Install 2 x 4 cleats to both ceiling joists. In some
cases it may be necessary to use more than a single cleat on one
side. The distance between cleats must be at least 9
1
¼
8
" but not
more than 10".
8. Remove side wiring knockout and insert and secure an approved
box connector into the wiring entrance hole.
9. Use pliers to bend both mounting tabs as flush as possible to the
side of the housing.
10. Install duct collar.
11. String wiring through box connector and connect 4" flexible duct to
duct collar.
12. Carefully push ductwork and wiring back into cutout, keeping it
as straight as possible. Place housing into cutout.
13. Use wood screws to secure housing to cleats through four holes in
housing's pan. make sure pan is flush to finished ceiling.
14. Install Power/Blower Unit and complete installation as described
above.
CLEANING AND RELAMPING
1. Pull lens away from reflector/grille assembly.
2. Squeezing the mounting springs together, remove lens to expose
socket for relamping.
3. Use only a mild soap and water solution to clean grille and lens.
Do not use strong, abrasive cleaners.
4. After cleaning or relamping, reinstall reflector/grille assembly
and lens as previously instructed.
FIGURE 1
WIRING
KNOCKOUTS
SCROLL
POWER/
BLOWER UNIT
REFLECTOR
LENS
WING NUT
TABS
SLOTS