Regular security check and maintenance  

 

 Filling out and leave in this manual

 

 

 

 

 

 

 

 

 

 

 

 

 

 

all   

defect        veri-  

kind 

of 

check          right missing 

fication  remark 

---------------------------------------------------------------------------------------------------------------------------------------- 

Type plate...........................................................  

F

   

 

F

   

 

F

     .................................................. 

Short operating instruction................................. 

F

   

 

F

   

 

F

     .................................................. 

Sticker capacity…….......................................... 

F

   

 

F

   

 

F

     .................................................. 

Designation lifting/lowering..............................  

F

   

 

F

   

 

F

     .................................................. 

Detailed operating instruction............................ 

F

   

 

F

   

 

F

     .................................................. 

Main switch lockable......................................... 

F

   

 

F

   

 

F

     .................................................. 

Function button „lifting/lowering“.....................  

F

   

 

F

   

 

F

     .................................................. 

Function button “unlocking the ratchet”............  

F

   

 

F

   

 

F

     .................................................. 

Function the lever “lowering”............................  

F

   

 

F

   

 

F

     .................................................. 

Function fixing of the carrying arms.................  

F

   

 

F

   

 

F

     .................................................. 

Securing of the bolts.......................................... 

F

   

 

F

   

 

F

     .................................................. 

Condition bolts and bearings.............................. 

F

   

 

F

   

 

F

     .................................................. 

Construction (deformation, cracking) ................ 

F

   

 

F

   

 

F

     .................................................. 

Torque of the screws and dowels...................... 

F

   

 

F

   

 

F

     .................................................. 

Condition operating unit.................................... 

F

   

 

F

   

 

F

     .................................................. 

Condition surface piston rod............................. 

F

   

 

F

   

 

F

     .................................................. 

Condition of the cover......................................  

F

   

 

F

   

 

F

     .................................................. 

Condition of the welding...................................  

F

   

 

F

   

 

F

     .................................................. 

Condition electrical wires ............................. 

F

   

 

F

   

 

F

     .................................................. 

Level of hydraulic oil ...................................   

F

   

 

F

   

 

F

     .................................................. 

Condition of the hydraulic system..................... 

F

   

 

F

   

 

F

     .................................................. 

Condition hydraulic hoses................................. 

F

   

 

F

   

 

F

     .................................................. 

Function test with vehicle.................................. 

F

   

 

F

   

 

F

     .................................................. 

Function equalisation of the lift........................  

F

   

 

F

   

 

F

     .................................................. 

Condition of the equalisation ropes................... 

F

   

 

F

   

 

F

     .................................................. 

Condition rubber pads....................................... 

F

   

 

F

   

 

F

     .................................................. 

Condition pulleys..............................................  

F

   

 

F

   

 

F

     .................................................. 

Condition concrete floor.................................... 

F

   

 

F

   

 

F

     ..................................................

 

( mark here applicable, in case of verification mark in addition to the first mark!) 
---------------------------------------------------------------------------------------------------------------------------------------- 

 
Security check carried out:...................................................................................................................... 
 
Carried out the company:.........................................................…………................................................ 
 
Name, address of the competent:.........................................……........................................................... 
 

Result of the Check: 

 

 

 

 

 

 

 

 

F

 Initiation not permitted, verification necessary 

 

 

 

 

 

 

 

 

F

 Initiation possible, repair failures 

until......................................................... 

 

 

 

 

 

 

 

 

F

 No failings, Initiation possible 

 

........................................................ 

    ........................................................... 

signature of the expert 

 

 

 

 

 

 

 

signature of the operator 

 

If failures must be repaired: 

Failures repaired at: 

.......................... 

   ................................................... 

signature of the operator 

(Use another form for verification!) 
 
 
 

Serial-number:_______________ 

Summary of Contents for SPL 4000

Page 1: ...date 04 12 2007 Operating instruction and documentation Serial number Otto Nu baum GmbH Co KG Korker Stra e 24 D 77694 Kehl Bodersweier Tel 49 0 7853 8990 Fax 49 0 7853 8787 E Mail info nussbaum lifts...

Page 2: ...agram drawing Standard 3x400V 14 3 6 Instruction for assembly to the change of 3x400V on 3x230V 15 4 Safety regulations 18 5 Operating Instructions 18 5 1 Lifting the vehicle 19 5 2 Lowering the vehic...

Page 3: ...lift Especially the chapter Safety accident Prevention has to be observed In addition to the safety remarks of the instructions for use the regulations and instructions being valid at the place of ope...

Page 4: ...time intervals including Details for exchange of parts part components as mentioned in the instructions for use are to be adhered These works must only be carried out by expert personal After maintena...

Page 5: ...se delete as applicable The initial safety check was carried out by a competent person before the initial operation The operating authority confirms the correct installation of the automotive lift the...

Page 6: ...rted The persons below were introduced after the installation of the automotive lift The introduction was carried out from an erector of the lift manufacturer or from a franchised dealer competent per...

Page 7: ...t They are called experts and competent person in this document Experts are persons for example self employed engineers experts who have received instruction and have experience to check and to test a...

Page 8: ...designed for servicing vehicles It is not allowed to carry persons with the lift It s not allowed to install the standard automotive lift in a hazardous location or washing bays 2 3 Changes at the co...

Page 9: ...Operating Instruction and Documentation SPL 4000 9 2 5 Attestation of conformity...

Page 10: ...il tank approx 10 liter Sound level 75 dB A Connection by customer 3 N PE 400V 50 Hz fuse T16A time lag fuse observe your state regulations 3 2 Safety device 1 Safety device at the carrying arms Safet...

Page 11: ...Operating Instruction and Documentation SPL 4000 11 3 3 Data sheet 4090 mm with extension...

Page 12: ...Operating Instruction and Documentation SPL 4000 12 3 3 1 Data sheet 3650 mm...

Page 13: ...Operating Instruction and Documentation SPL 4000 13 3 4 Foundation diagram 200mm...

Page 14: ...Operating Instruction and Documentation SPL 4000 14 3 5 Electrical diagram drawing Standard 3x400V...

Page 15: ...that reconnection may be accomplished only by an electrical specialist 1 The controller housing is from the aggregate to loose 1 screws The front cover is to be removed Afterwards can be begun with t...

Page 16: ...Operating Instruction and Documentation SPL 4000 16...

Page 17: ...awing Hydraulic parts list 0 1 Oil tank 0 2 motor 992463 0 3 gear pump 1BK7D6 7Q 0 4 Oil filter 980012 0 5 Oil level gauge 980098 0 6 Hydraulic block 230SPL01053 0 7 Holding valve 980480 0 8 Pressure...

Page 18: ...raised vehicle The automotive column lift must be checked by an expert after changes in the construction have been made The main switch must be switched off and locked before work on the vehicle can c...

Page 19: ...itioned on the pads the vehicle is not secure and the risk exists that the vehicle may fall Raise the vehicle to the required working height Press the button lifting Observe the complete process 5 2 L...

Page 20: ...not lift Potential causes Repair failures The vehicle is too heavy The oil level is too low Defective hydraulic valve Gear pump is defective Leakage in the hydraulic system Unload the vehicle Refills...

Page 21: ...nd the lift To guarantee the utmost availability and to ensure that the lift remains functional maintenance work contracts are organised between our clients and their local retailers A service must be...

Page 22: ...Use abrasive paper grain 280 White rust can result from moisture laying in certain areas for long periods of time Poor aerating can also result in rust formation Rust may result from mechanical damage...

Page 23: ...n the parts Use an standard washing up liquid and lukewarm water Do not use for cleaning a steam jet cleaning Remove all dirt careful with a sponge if necessary with a brush Pay attention that are no...

Page 24: ...st be protected with T16A VDE0100 German regulation The minimum diameter amounts to 2 5 mm Pay attention to the tension of your state All cable ducts have to be equipped with protective coverings to p...

Page 25: ...ine up of the columns and look if they are vertical If they aren t vertical correct with suitable bases pic 3 course of the ropes Tighten the Dowels with a dynamometric key Pay attention the regulatio...

Page 26: ...l Fasten self locking nuts at upper side in both carriages regularly until both ropes are tighten lightly If the thread at upper side of carriage is too short the self locking nut at the other side ca...

Page 27: ...gulations of the first installation The changing should be performed in accordance with the following points Raise the lift on approx 800 mm Switch off the main switch and lock it Loose and remove the...

Page 28: ...of bore d 20 Thickness of the lift pieces e 0 40 Number of dowels 12 Starting torque 70 minimum thickness of concrete by using the mentioned dowels Otherwise observe the regulation of the foundation...

Page 29: ...concrete c min 160 min 160 min 160 Diameter of bore d 20 20 20 Thickness of the lift pieces e 40 65 65 100 100 140 Number of dowels 12 12 12 Starting torque 70 Nm 70Nm 70Nm minimum thickness of concr...

Page 30: ...ce piston rod F F F Condition of the cover F F F Condition of the welding F F F Condition electrical wires F F F Level of hydraulic oil F F F Condition of the hydraulic system F F F Condition hydrauli...

Page 31: ...F F Condition of the cover F F F Condition of the welding F F F Condition electrical wires F F F Level of hydraulic oil F F F Condition of the hydraulic system F F F Condition hydraulic hoses F F F Fu...

Page 32: ...f the cover F F F Condition of the welding F F F Condition electrical wires F F F Level of hydraulic oil F F F Condition of the hydraulic system F F F Condition hydraulic hoses F F F Function test wit...

Page 33: ...e piston rod F F F Condition of the cover F F F Condition of the welding F F F Condition electrical wires F F F Level of hydraulic oil F F F Condition of the hydraulic system F F F Condition hydraulic...

Page 34: ...e piston rod F F F Condition of the cover F F F Condition of the welding F F F Condition electrical wires F F F Level of hydraulic oil F F F Condition of the hydraulic system F F F Condition hydraulic...

Page 35: ...e piston rod F F F Condition of the cover F F F Condition of the welding F F F Condition electrical wires F F F Level of hydraulic oil F F F Condition of the hydraulic system F F F Condition hydraulic...

Page 36: ...e piston rod F F F Condition of the cover F F F Condition of the welding F F F Condition electrical wires F F F Level of hydraulic oil F F F Condition of the hydraulic system F F F Condition hydraulic...

Page 37: ...e piston rod F F F Condition of the cover F F F Condition of the welding F F F Condition electrical wires F F F Level of hydraulic oil F F F Condition of the hydraulic system F F F Condition hydraulic...

Page 38: ...ton rod F F F Condition of the cover F F F Condition of the welding F F F Condition electrical wires F F F Level of hydraulic oil F F F Condition of the hydraulic system F F F Condition hydraulic hose...

Reviews: