It is important to design the pipe runs so the hose is stored on one plane.
(figure 9).
Hose stored on two different planes. (figure 10).
Try to avoid back to back 90’s as
much as possible (figure 8).
figure 8
L
ow
V
oLtage
w
ire
Run low voltage wire to each inlet just as you would with a standard central
vacuum installation.
t
est
t
He
s
ystem
It is a good idea to test the system by retracting a hose before the walls are
sheet rocked. Since the inlet doors are needed to seal the system, hand balls
can be placed over each valve opening that is not being tested to seal the
system. In an up orientation, hand balls need to be taped in place.
Using a portable source of vacuum, check the system for sealed vacuum.
Sealed vacuum at the valve should not vary more than three to five inches
(12,7 cm) from the sealed vacuum at the power unit.
figure 9
figure 10
10
Diagrama típico del circuito de los conductos
1.
instalación en dos
plantas hacia abajo
Limitar la cantidad de
codos 90°.
2.
Dirigida
hacia abajo
Únicamente los codos especiales de la
manguera retractable pueden ser utiliza-
dos en el lugar donde se retracta la man-
guera (Codos 90º, de 45º y de 22,5º).
3.
Dirigida
hacia arriba
Es importante instalar
los conductos de PVC
de la manguera retrac-
table al mismo nivel.
Toma de corriente