![NuAire Xboxer xbc+ Ecosmart Connect Control Installation Manual Download Page 4](http://html1.mh-extra.com/html/nuaire/xboxer-xbc-ecosmart-connect-control/xboxer-xbc-ecosmart-connect-control_installation-manual_1716034004.webp)
4
21. 07. 20. Document Number 671954
Nuaire |
Western Industrial Estate
|
Caerphilly
|
CF83 1NA
|
nuaire.co.uk
XBC+ with Ecosmart Connect (C) Control
Installation Manual
4
6
7
8
5
Selectable Duct Connections (Top View)
Left Handed (L) Arrangement (Top View)
Bottom Access Unit Only
Unit Lifting
Right Handed (R) Arrangement (Top View)
Plan view
Extract
Counterflow Plate Heat Exchanger
Position 2.
Extract
Position 1.
Supply
Intake
(Fixed)
Position 1.
Intake
Position 2.
Discharge
(Fixed)
Filter
Plan view
Blanking
plate
Extract
Position 1.
Supply
(Fixed)
Intake
Position 2.
Discharge
(Fixed)
Filter
Blanking
plate
Coil connections
LPHW or Electric Heater Battery
Control
LPHW or Electric Heater Battery
Counterflow Plate Heat Exchanger
Filter access
Filter access
Filter access
Filter access
Plan view
Discharge
Supply
(Fixed)
(Fixed)
Extract
Position 1.
Blanking
plate
Blanking
plate
Intake
Position 2.
Control
Coil connections
LPHW or Electric Heater Battery
Filter Counterflow Plate Heat Exchanger
Note: The unit is shipped with four G4 filters in place, two of which are included as spares. For F7 filters contact Nuaire.
Plan view
Extract
Counterflow Plate Heat Exchanger
Position 2.
Extract
Position 1.
Supply
Intake
(Fixed)
Position 1.
Intake
Position 2.
Discharge
(Fixed)
Filter
Plan view
Blanking
plate
Extract
Position 1.
Supply
(Fixed)
Intake
Position 2.
Discharge
(Fixed)
Filter
Blanking
plate
Coil connections
LPHW or Electric Heater Battery
Control
LPHW or Electric Heater Battery
Counterflow Plate Heat Exchanger
Filter access
Filter access
Filter access
Filter access
Plan view
Discharge
Supply
(Fixed)
(Fixed)
Extract
Position 1.
Blanking
plate
Blanking
plate
Intake
Position 2.
Control
Coil connections
LPHW or Electric Heater Battery
Filter Counterflow Plate Heat Exchanger
Note: The unit is shipped with four G4 filters in place, two of which are included as spares. For F7 filters contact Nuaire.
3.2 Delivery of Equipment
3.2.1 Receipt of Equipment
All equipment is inspected prior to despatch and leaves the factory in
good condition. Upon receipt of the equipment an inspection should be
made and any damage indicated on the delivery note.
Particulars of damage and/or incomplete delivery should be endorsed
by the driver delivering the goods before offloading by the purchaser.
No responsibility will be accepted for damage sustained during the
offloading from the vehicle or on the site thereafter. All claims for
damage and/or incomplete delivery must be reported to Nuaire within
two days of receipt of the equipment following Nuaire's Terms &
Conditions.
3.2.2 Offloading and Handling
The weight of the unit modules and palletised items is displayed on
the unit rating plate or on the packaging. Some of the modules have an
uneven weight distribution, and this will be indicated by labelling where
appropriate. Ensure that lifting and handling equipment is adequately
rated. Offloading and positioning of the equipment is the responsibility
of the purchaser.
Spreaders should be used when lifting with slings to avoid damage
to the casings. Care must be taken to ensure that slings are correctly
positioned to avoid crushing and twisting of the unit castings.
Where channels and/or support frames are bolted to the underside of
the unit casing, slings or fork-lift arms should be positioned to locate in
the apertures in the channels. If lifting eyes have been supplied / fitted
it is recommended that they are used.
XBOXER XBC units will be delivered to site in one section and will be
labelled with the direction of air flow. The direction convention must be
observed during assembly.
The unit may only be operated in its intended horizontal installation
plane and must be fully levelled during installation (this is essential to
ensure that condensate drains correctly).
See Section 3.5 for dimensions and weights.
3.2.3 Storage
The equipment must be stored in a dry, internal location. Ductwork
connection apertures shall be sealed against the ingress of dust, water
and vermin. Do not stack units, modules or components.
Where fans are to be stored or bonded for extensive periods follow the
Warranty Guidance Notes found in our conditions of sale.
3.3 Assembly of Equipment
Units must be installed in accordance with good industry practice.
These units may only be mounted horizontally and must be fully
levelled in the horizontal plane. The units are heavy, and should be
mounted using the fixing brackets supplied or other suitable methods
of support. The supporting structure must be assessed for structural
suitability.
Heat recovery components and modules that incorporate cooling
coils may produce condensation during use. An insulated drip tray and
condensate pump is provided. The drain connection must be connected
to a suitable drainage point (Figure 23 on page 12 for details).
Palletised.
Slings via spreaders fitted to unit with base frame.