![NuAire XBC75 Installation Manual Download Page 16](http://html1.mh-extra.com/html/nuaire/xbc75/xbc75_installation-manual_1716027016.webp)
16
09. 06. 21. Document Number 671786
Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk
XBC75 & 85 (AS Control)
Installation Manual
7.9 Wiring Diagrams
All inter-connections between circuit boards, blowers and sensors
are made at the factory. This diagram only shows the essential field
wiring points for clarity.
27
Wiring Diagram - No Heater / LPHW