![NuAire MRXBOXAB-ECO2-AESW Installation And Maintenance Manual Download Page 5](http://html1.mh-extra.com/html/nuaire/mrxboxab-eco2-aesw/mrxboxab-eco2-aesw_installation-and-maintenance-manual_1715933005.webp)
5
nuaire.co.uk
029 2085 8400
04. 11. 19. Leaflet Number 671859
Installation and Maintenance
MRXBOXAB-ECO2-AESW Mechanical Ventilation Unit with Heat Recovery
Exhaust air from
kitchen/bathroom to
outside via air brick.
Minimum distance as specified
in building regulations.
Intake air
from outside
via air brick.
All duct between MVHR
unit and atmosphere to
be insulated*.
*Insulated
supply duct.
Air supply
to lounge
in ceilings.
Extract
via Air Valve
air from
kitchen/
bathroom
in ceilings.
via Air Valve
Air supply
to bedrooms
in ceilings.
via Air Valve
Top of ceiling void.
MVHR unit.
Nuaire
MVHR-DRAIN
Condensate drain, uninsulated
drain pipe with min 5
o
fall running to SVP.
*Insulated
extract duct.
4.0 DUCTING ARRANGEMENTS - STANDARD CONFIGURATION
Figure 12. Typical ducted arrangement for a wall mounted unit using circular ducting.
Figure 13. Typical ducted arrangement for a wall mounted unit using rectangular ducting.
Air supply
to lounge
in ceilings.
via Air Valve
Extract air
from
kitchen/
bathroom
in ceilings.
via Air Valve
Exhaust air from
kitchen/bathroom to
outside via louvre grille.
Minimum distance as specified
in building regulations.
Intake air
from outside
via louvre grille.
All duct between MVHR
unit and atmosphere to
be insulated*.
*Insulated
supply duct.
Top of ceiling void.
Air supply to
bedrooms
in ceilings.
via Air Valve
MVHR unit.
Nuaire
MVHR-DRAIN
Condensate drain, uninsulated
drain pipe with min 5
o
fall running to SVP.
*Insulated
extract duct.
New
ALSO FROM NUAIRE -
range of thermal ducting,
an all-in-one insulated ducting system
(see installation document 671780)