OM0303
Rev 5 July/2021
Page 69 of 108
7.10 Main Control Board Description & Replacement
To access the main control board for fuse or board replacement, remove screws at each upper side of the control center
and allow the control center to rotate down, resting on the safety straps. Now the main control board is exposed for
service.
7.10.1 Main Control Board Replacement
The main control board consists of two interconnected Printed Circuit Board (PCB) assemblies. The front PCB
contains the LCD display. The back PCB contains the power supply, configuration switch, sensor inputs/outputs
and control inputs/outputs components. The mechanical and electrical interconnects for the two PCB's all occur
within the assemblies and are fastened together with standoffs and screws.
7.10.2 Main Control Board Fuse Replacement
Disconnect electrical power from cabinet before fuse replacement.
All AC circuits are fuse protected and when replacement is necessary,
USE ONLY FUSES OF SAME TYPE AND RATING FOR
PROTECTION AGAINST RISK OF FIRE
.
DESCRIPTION:
BLOWER FUSE
OUTLET FUSE
LIGHT FUSE
FUSE TYPE:
TIME-LAG
TIME-LAG
TIME-LAG
FUSE SIZE:
1/4 X 1-1/4 INCH
5 X 20MM
5 X 20MM
NU-581-400E
15 AMPS
3 AMPS (2)
1 AMP
NU-581-500E
15 AMPS
3 AMPS (2)
1 AMP
NU-581-600E
15 AMPS
3 AMPS (2)
1 AMP
7.10.3 Main Control Board Replacement
Note: All setup and calibration data will be lost,
the memory reinitialized to the default values and all control
functions reset to an initial cabinet power condition. If possible, before the main control board replacement, it
would be preferred to know the operational parameters of the cabinet, (i.e. motor/blower voltage, setpoints, and
airflow data from previous certification.
Disconnect electrical power from the cabinet before attempting any
maintenance action.
The main control board is fastened to the control center with (6) 6-32 screws. All electrical connections are made
with removable terminals and/or Fasten connectors except for the motor/blower connector which uses a screw
terminal. Remove all electrical connections and fasteners then remove the main control board from the control
center.
Install new main control board by reattaching all electrical connections and fasteners. Once installed, rotate
control center to normal position and fasten in place.
Now reconnect power to cabinet. Upon BSCC system power up, a system master reset must be performed to clear
the microprocessors non-volatile memory to assure proper system function.
CAUTION
!
CAUTION
!
Summary of Contents for LabGard NU-581-400E
Page 7: ...OM0303 Rev 5 July 2021 Page 7 of 108 ...
Page 9: ...OM0303 Rev 5 July 2021 Page 9 of 108 ...
Page 10: ...OM0303 Rev 5 July 2021 Page 10 of 108 ...
Page 11: ...OM0303 Rev 5 July 2021 Page 11 of 108 ...
Page 15: ...OM0303 Rev 5 July 2021 Page 15 of 108 ...
Page 30: ...OM0303 Rev 5 July 2021 Page 30 of 108 Set New Password Retype new password ...
Page 43: ...OM0303 Rev 5 July 2021 Page 43 of 108 ...
Page 101: ...OM0303 Rev 5 July 2021 Page 101 of 108 ...
Page 102: ...OM0303 Rev 5 July 2021 Page 102 of 108 ...
Page 103: ...OM0303 Rev 5 July 2021 Page 103 of 108 ...
Page 104: ...OM0303 Rev 5 July 2021 Page 104 of 108 ...
Page 105: ...OM0303 Rev 5 July 2021 Page 105 of 108 ...
Page 106: ...OM0303 Rev 5 July 2021 Page 106 of 108 ...