5.4
Certification
Testing
Methods
and
Equipment
After
installation
and
prior
to
use,
NuAire
recommends
that
the
cabinet
be
certified
or
commissioned
to
factory
standards.
As
a
part
of
certification,
the
certifier
should
go
through
the
following
initial
checklist
to
assure
all
aspects
of
the
LFBSC
installation
are
complete
and
ready
for
certification.
Review
product
installation
Exhaust
connection
Damper
valve
installed
correctly
with
label
toward
front
LFBSC
base
stand
level
Verify
airflow
sensor
shroud
is
in
place
Downflow
Verify
configuration
type
selection
for
specific
model
*
(see
section
7.5.2)
Verify
setpoints
and
alarm
limits
for
specific
model
*
(see
section
7.5.2)
Perform
BCS
certification
At
a
minimum,
the
following
tests
should
be
performed:
HEPA
filter
leak
test
Downflow
velocity
test
Inflow
velocity
test
Airflow
smoke
patterns
Site
installation
assessment
tests
Perform
Site
Assessment
Tests
The
NU
‐
430
requires
verification
of
the
supply
fan
interlock
and
back
‐
up
pressure
switch
operation
utilizing
independent
exhaust
volume
measurement
instrument
(DIM).
Per
NSF/ANSI
49,
a
20%
loss
of
exhaust
volume
must
produce
an
airflow
alarm
within
15
seconds.
The
testing
methods
and
equipment
required
are
specified
on
the
factory
inspection
report
included
with
this
manual.
(See
insert
in
back
cover)
NOTE:
IT
IS
RECOMMENDED
THAT
THESE
TESTS
BE
PERFORMED
BY
A
QUALIFIED
TECHNICIAN
WHO
IS
FAMILIAR
WITH
THE
METHODS
AND
PROCEDURES
FOR
CERTIFYING
BIOLOGICAL
SAFETY
CABINETS
(SEE
INSERT)
NOTE:
AFTER
THE
INITIAL
CERTIFICATION,
NUAIRE
RECOMMENDS
THAT
THE
CABINET
BE
RECERTIFIED
(AT
A
MINIMUM)
ON
AN
ANNUAL
BASIS
AND
AFTER
EVERY
FILTER
CHANGE
OR
MAINTENANCE
ACTION
OR
ANY
TIME
THE
OPERATOR
FEELS
IT
IS
NECESSARY.
Note
that
the
LABGARD
ES
cabinets,
filters,
and
seals
provide
premium
performance.
Quality
Control
in
both
design
and
manufacturing
assure
superior
reliability.
However,
protection
to
both
product
and
operator
is
so
vital
that
certification
to
the
performance
requirements
should
be
accomplished
as
stated
to
ensure
biological
safety
established
by
the
factory
standards.
*
If
the
specific
model
is
a
special
product
with
non
‐
standard
setpoints
and
alarm
limits,
the
new
values
will
be
located
on
the
factory
Inspection
Report.
Summary of Contents for Labgard NU-430-400
Page 7: ...OM0228 Page 7 of 99 February 2014 ...
Page 9: ...OM0228 Page 9 of 99 February 2014 ...
Page 10: ...OM0228 Page 10 of 99 February 2014 ...
Page 16: ...OM0228 Page 16 of 99 February 2014 ...
Page 17: ...OM0228 Page 17 of 99 February 2014 ...
Page 41: ...OM0228 Page 41 of 99 February 2014 ...
Page 93: ...OM0228 Page 93 of 99 February 2014 ...
Page 94: ...OM0228 Page 94 of 99 February 2014 ...
Page 95: ...OM0228 Page 95 of 99 February 2014 ...
Page 96: ...OM0228 Page 96 of 99 February 2014 ...
Page 97: ...OM0228 Page 97 of 99 February 2014 ...