NOVUS AUTOMATION
31/57
For the iOS application, on the other hand, the device will present the following screen, requesting that the logs be downloaded:
Fig. 17
– iOS: Logs screen
Once the connection to the device is complete, a selection screen for the download period will be available.
The "Download from Date" parameter will be automatically fills by the application with the date/time of the first log. The "Download to Date"
parameter will be fills with the most recent log date/time.
As long as there are logs in the chosen period, you can freely change the dates.
Android
iOS
Fig. 18
– Period selection for connecting