GB
Installation
Required tools
Installing the control unit
Opening the control unit cover
Floating relay output
Floating relay output
Hydraulic valves and sensors
The control unit comes ready-wired with a 16A CEE
phase-changer plug and approx. 1 m of cable (see
4a)
.
Wrong connection of mains voltage
Main switch
A main switch is provided for
disconnection of all poles of the mains
voltage. Secure the main switch against
unauthorised use during maintenance
or repair.
Connection of hydraulic motor
Valve connection
A sensor and limit switch for the automatic return
function can be installed beside the valve
connection.
Emergency stop button
Remove the jumper and connect the emergency
stopbutton. Pressing the emergency stop button
stops the platform transfer bridge, no floating
position.
Connection for gate-open sensor
For safety reasons, the platform transfer bridge can
only be operated when the gate is open.
Possible connections:
6a
Mechanical limit switch
6b
Inductive proximity switch or
br
- brown
bk
- black
bl
- blue
Wedge chock
Possible connection of a wedge chock sensor.
Selection of menu 15 = 1.
The platform transfer bridge can only lift and extend
when the wedge chock is applied.
br
- brown
gr
- grey
bk
- black
Key switch connection
When using a key switch, the desired function in
menu 50 should be selected.
Connections
Designation:
J4
Emergency stop
J5
Door-Open-Sensor
J6
Wedge chock
J7
Key switch
J10
Connection of add-on controls
J13 Membrane keypad
J14 Communication interface
X1
Mains connection
X2
Mains output L, N (500 W / 230 V)
X3
Protective conductor contact
X5
1
X6
2
X8
Mains connection
can
destroy the control.
!
Observe rotating field.
0
1
2
3
4
5
6
7
8
9
Programming the control unit
Floating relay output
Connect the visual and audible warning signals to X5
and loading lamp to X6.
Programming is menu-driven. Make all settings as
shown in the schematic.
Protected settings are identified by the letter
L
in the
display and access to the menu is barred. To release
the menu, the release signal must be sent with the
infrared control.
Hydraulic motor overcurrent (menu 10)
If the set overcurrent is exceeded, the control will
switch off the pump.
Automatic time (menu 13)
When the return button is pressed, the platform
transfer bridge is lifted for the time set and then
lowered safely to rest position.
Automatic return
When button is released, the support retracts for
the set time to correct the position.
Initial start-up
To ensure safe operation of the platform transfer
bridge the first start-up should be performed by
instructed personnel.
-
Switch on the main switch.
-
Make a trial run during which you perform
you all control functions.
If all control operations work smoothly, the platform
transfer bridge is ready for use.
10