14
X
X
X
X
1.
1.
•
Assemble the complete top roller with the door panels, i.e. :
- bearing block, pulley and drive with torque support on the driving side
- bearing block and pulley at on the other side.
•
Lift the entire package using a forklift truck and place the package with the block
bearings on the appropriate attachment points of the consoles (X).
•
Tighten the mounting bolts of the bearing blocks and the drive, finger-tight.
•
Align the shaft so it is parallel with the consoles.
•
Maintain a distance of 10 - 30 mm between the wall and the roller.
•
After a final check tighten all mounting bolts and secure the torque support to
the guide rail in the appropriate bore holes (1).
Tighten and secure
the free end manually!
M8 hex screws
(2X)
Aluminium pulley
Flush-mounted M8
screws (2X)
Wrap the tension belt
1.5 - 2 times around it
Reverse plate
Clamping washer
Plastic guide rail
Belt holder with
plastic guide rail
Clamping washer
Is deliv
er
ed r
eas
sembl
ed
15
4.5
4.6
Installation of the complete top roller
Attaching the tension belts
GB
GB