![Novatron XSITE PRO SPI 14.2 User Manual Download Page 26](http://html1.mh-extra.com/html/novatron/xsite-pro-spi-14-2/xsite-pro-spi-14-2_user-manual_1711574026.webp)
Place measurement point of the bucket to the stake.
Fig. 26. Measuring depth, reference is taken from a stake (or from another reference)
If excavator’s altitude is changed bring the receiver to the beam again.
Fig. 27. Move the boom to the laser beam until audible note is given
In this example the target (cut) depth has been set to 1.80 m below “start depth”.
User Manual. Xsite PRO SPI 14.2 Page 23 / 77
Summary of Contents for XSITE PRO SPI 14.2
Page 1: ...XSITE PRO SPI 14 2 USER MANUAL Version 1 14 2 46 October 2018...
Page 33: ...Fig 36 Tilt bucket calibration User Manual Xsite PRO SPI 14 2 Page 30 77...
Page 76: ...User Manual Xsite PRO SPI 14 2 Page 73 77...
Page 77: ...User Manual Xsite PRO SPI 14 2 Page 74 77...