OnTime Clock
Installation and User Guide
Firmware Version 1
All claims based on information publicly available at time of printing. All other product or service names mentioned
in this document may be trademarks of the companies with which they are associated.
© 2015 Novanex, Inc. | All rights reserved | page 11
4.
Withdraw the fasteners until there is a
1
/
16
” (.16cm) gap between the
mounting
surface and the back of the fastener head.
5.
Insert the data cable into the jack located at the back of the OnTime Clock.
6.
Position the keyhole slots located on the rear of the clock over the fastener heads.
7.
Pull the clock slightly downward until the unit is seated securely.
4.7. Pendant Mounting the Digital Clock
– Single or Double
The following is a recommended procedure for pendant mounting. This procedure
requires a mounting kit (either ONT4KIT or ONT6KIT) and some additional hardware.
Figure 7: Digital Clock Pendant Mounting
1.
Determine the clock mounting location.
Note: The illustration above suggests a recommended mounting means for a pendant
mount of one or more OnTime Clocks.
Supplement the mounting kit with two
suit
able locknuts and a length of ¾”
(1.9 cm) pipe or conduit.
2.
Mark the location where the clock assembly is to be mounted, making sure that
the mounting means is located beneath the data cable outlet.
3.
Assemble and tighten the locknuts and pipe length as shown above.
4.
Insert about 10 to 12 inches (30 cm) of data cable through the center hole of the
mounting kit. Securely attach the mounting means, using fasteners suitable for
the surface.
5.
Lift an OnTime Clock into position and insert the data cable into the jack located
on the back of the clock.
6.
Position the keyhole slots located on the rear of the clock over the mounting tabs.
7.
Pull the clock slightly downwards until the unit is seated.
8.
Repeat for the second clock if two clocks are being installed back-to-back.