11
3.2 Blade guard assembly
•
The blade guard is not assembled in factory
to prevent it from being damaged during
transport.
•
Assemble the blade guard on the support (1)
3.3 Guide-a-cut assembly
•
Put the guide-a-cut on the table.
•
Screw the two locking screws.
3.4 Electrical connections
Check that,
•
the voltage/phase supply corresponds to the information indicated on the motor plate.
•
Available power supply must have ground connection in conformity with safety regulations.
•
The connecting cables should have at least a 2.5mm
2
-section per phase.
3.5 Starting the machine
Open the cover on the switch and press the green button to start the machine. Either press on the
red button or directly on the switch cover to stop the machine.
3.6 Water cooling system
•
Fill the water pan with clean water to the small hole drilled into the plastic water tray.
•
Ensure that water is delivered adequately to both sides of the blade, as insufficient water supply
may result in premature failure of the diamond blade.
•
Always make sure that there is enough water in the pan and refill if necessary.
•
In case of frost, empty the water cooling system from its water.
Summary of Contents for TT 250 G
Page 1: ...TT 250 G OPERATING INSTRUCTIONS...
Page 2: ...2...
Page 4: ...4...
Page 16: ...16 7 3 Circuit diagram...
Page 19: ...19...