background image

16 

6  Maintenance and servicing 

To  ensure  a  long-term  quality  from  the  cutting  with  the  CHW,  please  follow  the  maintenance  plan 
below:  

 

 

 B

e

g

in

 o

th

e

 d

a

y

 

 D

u

ri

n

g

 t

h

e

 c

h

a

n

g

in

g

 o

to

o

 E

n

d

 o

th

e

 d

a

y

  

o

m

o

re

 o

ft

e

n

 i

re

q

u

ir

e

d

 

 E

v

e

ry

 w

e

e

k

 

 A

ft

e

a

 f

a

u

lt

 

 A

ft

e

a

 d

a

m

a

g

e

 

Visual  control  (general  aspect, 
watertightness) 

 

 

 

 

 

 

Whole machine 

Clean 

 

 

 

 

 

 

Flange and blade fixing devices 

Clean 

 

 

 

 

 

 

Motor cooling fans 

Clean 

 

 

 

 

 

 

Water pump 

Clean 

 

 

 

 

 

 

Water pan 

Clean 

 

 

 

 

 

 

Water hoses and nozzles 

Clean 

 

 

 

 

 

 

Water pump filter 

Clean 

 

 

 

 

 

 

Cart guiding bars 

Clean 

 

 

 

 

 

 

Motor housing 

Clean 

 

 

 

 

 

 

Reachable nuts and screws 

Tighten up 

 

 

 

 

 

 

 
Maintenance of the motor 

Always perform the maintenance of the motor with the machine isolated from the electrical supply.  
 

Lubrication 
The CHW uses life-lubricated bearings. Therefore, you don’t need to lubricate the machine at all. 
 
Cleaning of the machine 
Your  machine  will  last  longer  if  you  clean  it  thoroughly  after  each  day  of  work,  especially  water 
pump, water pan (which can be removed for easy cleaning), motor and blade flange. 
Never  use  acid-based  cleaning  products,  as  the aluminium  parts  (water  tray,  rails, motor  housing) 
can be corroded by these cleaning products. Always clean the machine when any cutting dust and 
debris  is  still  fresh,  never  allow  the  deposits  to  solidify.  To  make  the  cleaning  of  the  pump  tank 
easier, you can open it as shown on picture 7: 

 

Picture 7: open the water pump tank to clean it 

Summary of Contents for clipper CHW Series

Page 1: ...CHW OPERATING INSTRUCTIONS...

Page 2: ...2...

Page 3: ...230V Code 70184614040 70184614039 is in conformity with the following Directives European Machinery Directive 2006 42 EC LOW VOLTAGE 2006 95 EC Electromagnetic Compatibility Directive 2004 108 EC and...

Page 4: ...4...

Page 5: ...ommissioning 11 3 1 Head locking 11 3 2 Tool assembly 11 3 3 Electrical connections 12 3 4 Water cooling system 12 4 Transport and storing 12 4 1 Securing for transport 12 4 2 Transport procedure 13 4...

Page 6: ...bserving the operating instructions and compliance with inspection and servicing requirements shall also be considered as included under use in accordance with the regulations 1 1 Symbols Important wa...

Page 7: ...specified Processes No 8 of the Protection of Eyes Regulation 1974 Regulation 2 2 Part 1 For security reasons never leave the machine unattended untied or unlocked Electrical powered machine Always t...

Page 8: ...will immediately appreciate the attention given to detail and quality of materials used in construction The machine and its component parts are assembled to high standards assuring long life and mini...

Page 9: ...smooth movement The conveyor cart is equipped with graduated scale on the backstop and with a guide a cut device Water cooling system 7 The coolant system comprises A powerful submersible electric wa...

Page 10: ...nd pressure level 80 dB A ISO EN 11201 Sound energy level 92 dB A ISO EN 3744 70184610052 70184614039 70184614077 CHW500 Cutting length mm 500 mm Table dimension 500x500 mm Machine dimensions 1130x705...

Page 11: ...imum permitted rotation speed Before mounting a new blade into the machine switch off the machine and isolate it from the main source of electricity To mount a new blade follow these steps Open the ou...

Page 12: ...he water cooling system from its water 4 Transport and storing 4 1 Securing for transport Before transporting or lifting the machine always remove the blade and empty the water pan You can transport t...

Page 13: ...5 1 1 Siting the machine Remove from the site anything which might hinder the working procedure Make sure the site is sufficiently well lit Observe manufacturer s conditions for connecting to power su...

Page 14: ...e material e g make 2 or 3 shallow cuts 5 2 2 Multiple step cutting Multiple step cutting consists of moving the conveyor cart with the material to be cut back and forward under the rotating blade Pla...

Page 15: ...k make sure tools are firmly seated Before using the machine make sure the two anti tipping devices are tighten correctly Loosen the knob 1 on picture 6 and tighten the anti tipping device 2 so the sh...

Page 16: ...Always perform the maintenance of the motor with the machine isolated from the electrical supply Lubrication The CHW uses life lubricated bearings Therefore you don t need to lubricate the machine at...

Page 17: ...ed by qualified electrician Motor is not running Defective motor Change motor or contact motor manufacturer Cutting advance too quick Cut slowly Blade is blunt or glazed Sharpen the blade in calcareou...

Page 18: ...18 7 3 Circuit diagram 230V Motor...

Page 19: ...19 115V Motor...

Page 20: ...ch is not always the quickest way Clear instructions will avoid problems and faulty deliveries If not sure please send us the defective part In the case of a warranty claim the part must always be ret...

Page 21: ...ts GmbH Birkenweg 45 49 D 50389 WESSELING Tel 02236 8911 0 Fax 02236 8911 30 e mail sales ngg saint gobain com Spain Saint Gobain Abrasivos S A Ctra Guipuzcoa km7 5 E 31195 BERRIOPLANO Navarra Tel 003...

Page 22: ...22...

Page 23: ...23 SAINT GOBAIN ABRASIVES 190 Bd J F Kennedy L 4930 BASCHARAGE LUXEMBOURG Tel 352 50401 1 Fax 352 501633 e mail sales nlx saint gobain com www construction norton eu 06 11 2008...

Reviews: