20
Northstar 2 kW Radar Installation Manual
3.8
Install the radar processor
Install the radar processor in a dry location away from spray, rain, drips, and condensation.
The location site must allow you to easily connect the radar processor to the ship's ground, the
interconnection cable, the power cable, and the 6000i and 6100i radar communications cable or the
8000i network cable. Check that these cables and the ship's ground can easily reach the radar
processor BEFORE you drill.
The radar processor dimensions are shown on the drilling template. Follow the instructions on the
drilling template to install the radar processor.
Summary of Contents for 2 kW
Page 1: ...Northstar 2 kW Radar Installation Manual 1 ...
Page 51: ......