The Servicing Schedule Chart below shows the service schedule required for proper maintenance of your marine
generator set. More detailed coverage of each Service Point (SP) is listed on the page noted in the ‘page’ column.
DAILY:
SP1
Check oil level in engine
SP8
Check primary fuel filter
SP15
Check cooling water level
SP26
Check crankcase vent system filter svc. indicator button
AFTER FIRST 50 HOURS:
SP2
Change engine oil
SP3
Change lube oil filter
EVERY 50 HOURS:
SP21
Check electrolyte in batteries
AFTER FIRST 100 HOURS/ EVERY TWO WEEKS
5
:
SP2
Change engine oil after first 100 hrs., then check every 2 wks.
SP3
Change oil filter after first 100 hrs., then check every 2 wks.
SP7
Check crankshaft vibration damper
7
SP15
Check coolant level
EVERY 250 HOURS :
SP2
Change engine oil
SP3
Change lube oil filter
SP4
Check air cleaner
SP19
Check zincs
EVERY 500 HOURS / YEARLY:
SP4
Replace air cleaner
SP5
Check belt condition
SP9
Change primary filter element (Racor)
SP10
Change secondary fuel filter
SP11
Check injectors
SP14
Check turbocharger boost pressure
SP16
Check cooling system
SP20
Change impeller in raw water pump
SP22
Check the state of the charge of the batteries
SP25
Check engine mounts
SP26
Check crankcase vent system, change element at 500 hrs.
SP27
Check air intake hoses
SP29
Check electrical ground connection
EVERY 2000 HOURS:
SP6
Check & adjust valve clearance
SP7
Check crankshaft vibration damper
SP12
Check fuel injection pump
SP16
Flush cooling system
SP17
Check and clean heat exchanger
SP23
Test thermostats
SP30
Check aftercooler, clean air side
1) Change the oil and filter at 50 hours, using break-in oil again, until changing it
at 100 hours, then at every 250 hours.
2) Perform all maintenance once a year even if hour level has not been reached.
3) Consult manufacturer's maintenance schedule.
4) Or whenever necessary.
Service Schedule Chart, Electronically Controlled Fuel System
SERVICE
50
100 250 500 2000
POINT
PAGE
OPERATION
DAILY Hours Hours Hours Hours Hours
ENGINE:
SP1
15
Check oil level
•
SP2
15
Change engine oil
2)
1)
1)
•
SP3
15
Change lube oil filters
2)
1)
1)
•
SP4
15
Check air cleaner
• •
SP5
Check belt condition
2)
•
SP6
16
Check valve clearances
2)
•
SP7
17
Check crankshaft vibration damper
5)
•
SP25
Check engine mounts
•
SP27
Check air intake hoses
•
FUEL SYSTEM:
SP8
17
Check primary filter (Racor)
3)
•
SP9
17
Change primary filter element (Racor)
3) 4)
•
SP10
17
Change secondary fuel filter
2) 4)
•
SP11
18-19
Check
injectors
2)
•
SP12 20-22
Check fuel injection pump
•
TURBOCHARGER:
SP13
23
Check air, oil & cooling water lines for leakage 2)
•
SP14
23
Check boost pressure
•
SP30
27
Check aftercooler, clean air side
•
SP26
27
Check crankcase vent system
2)
•
7)
COOLING SYSTEM:
SP15
25
Check cooling water level
•
SP16
25
Check and flush cooling system
2)
6)
•
SP17
25
Check and clean heat exchanger
2)
•
SP19 25-26 Check zinc electrodes
2) 4)
•
SP20
26
Change impeller in raw water pump
2) 4)
•
ELECTRICAL SYSTEM:
SP21
27
Check electrolyte level in batteries
2) 4)
•
SP22
27
Check condition of batteries with hydrometer 2)
•
SP23
Test thermostats
•
SP29
Check electrical ground connection
•
5) Replace damper every 4500 hours or after 60 months.
6) Check cooling system at 500 hours, flush at 2000 hours.
7) Check hoses, and o-rings on crankcase vent system, change
element at 500 hours.
Revised 9-16-15
Summary of Contents for M1064A
Page 11: ...OM2 2 1 17 9 Notes...
Page 48: ...OM2 2 1 17 46 Notes Added 4 10 12...
Page 49: ...OM2 2 01 17 47 D C Wiring 12 Volt Standard Ground for M1066A2 and M1066A3 Drawing D 3769B...
Page 50: ...OM2 2 01 17 48 D C Wiring 24 Volt Isolated Ground for M1066A2 and M1066A3 Drawing D 3772C...
Page 55: ......
Page 56: ......