O6140 03/03
13
Service
Point
OPERATION
HOURS/DATE
50 HOURS (or weekly)
SP5
Check V-belt tension
SP25
Check electrolyte in batteries
250 HOURS (or every 6 months)
SP2
Change engine oil
SP3
Change lubricating oil fi lter
SP4
Check air cleaner
SP8
Change primary fuel fi lter element
SP12
Check turbocharger air, oil & cooling lines for leakage
SP18
Check zinc electrodes - HE engines only
500 HOURS (or annually)
SP20
Change cooling system fi lter
750 HOURS (or annually)
SP4
Replace air cleaner
SP6
Check valve clearances
SP9
Change secondary fuel fi lter
SP10 Check
injectors
SP13
Check turbocharger boost pressure
SP15 Check
and
fl ush cooling system
SP19
Change impeller in sea water pump
SP25
Check state of charge of batteries
2400 HOURS
SP11
Check fuel injection pump
SP16
Check and clean heat exchanger
SP17
Check and clean gear oil cooler
SERVICE RECORD
Summary of Contents for LUGGER L6140A
Page 30: ...O6140 03 03 30 DC Wiring Diagram C 5298B L6140AL 12 Volt Standard Ground...
Page 31: ...O6140 03 03 31 DC Wiring Diagram C 5228A L6140AL 24 Volt Standard Ground...
Page 32: ...O6140 03 03 32 DC Wiring Diagram C 5299 M6140AL 24 Volt Standard Ground...
Page 33: ...O6140 03 03 33 AC Wiring Diagram B 7429H M6140 with Voltage Regulator AVC63 12 all voltages...