Assembly Instructions
have
no
damage.
function, and safety for the
Multi Jungle System
workout.
*Separate all of the parts after opening the box and verify that all parts are accounted for and
*Assemble the machine on a solid level surface. This will ensure the best possible performance,
*Clear a big enough working space before unpacking the box.
*Double check the packing materials to ensure no parts were accidentally thrown away.
Caution: Additional assitance is needed to help turn main frame assembly.
Step 2
With additional assistance carefully turn the Main Frame Assembly (A1) upside down, fitting in
Remove the preassembled 2- M10x16mm Cap Head Socket Screws (C4) and 2- M10 Flat
flat washers to secure the front stabilizer.
Assembly Guide and Owner’s Manual
Page 5
the styrofoam in the carton as shown below.
Step 1
*Before assembling the Air Rower, distinguish a proper and appropriate location for the unit.
Important: Make sure the Main Frame Assembly is stabilized before the next assembly.
Washers (C7) from the the Main Frame Assembly (A1) with 8mm Allen wrench.
Assemble the Front Stabilizer (C1) to the Main Frame Assembly using the same 2 screws and
This Screw needs to
be securely tightened first.
Note:
C7
C7
A1
C4
C1
C4
Summary of Contents for ARC-102
Page 2: ......