Page 34 of 34 Equipment replacement
553-2601-500A
Standard 2.0
December 1994
11
If previously removed, reinstall EMI shield and secure to cabinet with
mounting screws.
12
Reconnect all cables previously disconnected from connectors on
shelf backplanes.
13
Reinsert all circuit packs previously unseated.
14
Reinsert PE1 fuse (if removed) on QUX19 unit or set PE breaker on
QUX 20 unit for replaced backplane to ON.
15
With overlay program 32 (see 553-2301-511) enable the previously
disabled shelves by entering command ENLS 1 s, where 1 is the loop
and s is the shelf number.
16
Enter **** to abort overlay program 32.
17
To test replacement PE shelf, load overlay program 30 (NWS).
18
Enter command LOOP 1, where 1 is the loop number on which the
shelf was replaced.
19
If the system response is other than OK, refer to the trouble indicators
documented in this practice.