Page 9 of 46
ISDN Basic Rate Interface
Installation
12
Preinstallation preparation
Contents
The following are the topics in this section:
Prepare the site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9
Unpack and inspect . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10
Take inventory . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11
Reference list
The following are the references in this section:
•
Installation Planning (553-3001-120)
•
System Engineering (553-3001-151)
•
Power Engineering (553-3001-152)
•
System Installation Procedures (553-3001-210)
•
ISDN Basic Rate Interface: Product Description (553-3901-100)
Prepare the site
When installing a system, address the following factors.
•
environmental
•
structural
•
electrical
Refer to the following documents for more information.
•
Installation Planning (553-3001-120)
Summary of Contents for 553-3901-200
Page 2: ......
Page 4: ...Page 4 of 46 553 3901 200 Standard 7 00 January 2002...
Page 6: ...Page 6 of 46 Contents 553 3901 200 Standard 7 00 January 2002...
Page 8: ...Page 8 of 46 About this document 553 3901 200 Standard 7 00 January 2002...
Page 12: ...Page 12 of 46 Preinstallation preparation 553 3901 200 Standard 7 00 January 2002...
Page 46: ...Page 46 of 46 Install ISDN BRI hardware 553 3901 200 Standard 7 00 January 2002...
Page 47: ......