![Nortek PVE 120 Installation, Commissioning, Servicing Download Page 5](http://html1.mh-extra.com/html/nortek/pve-120/pve-120_installation-commissioning-servicing_1706006005.webp)
Reznor, PVE, Installation Manual EN 2019-11, D301113 iss D Page 3
In addition the installation must be carried
out in accordance with national or local
regulations and any other relevant Codes
of Practice by a qualified installer. Isolate all
electrical supplies to the heater & controller
before proceeding.
Warranty
The unit was test operated and inspected
at the factory prior to packing for dispatch
and was in proper operating condition. If
the heater has incurred damage in shipment,
document the damage with the transport
company and contact your supplier.
The heater is supplied with a 1 year parts and
labour warranty and a further year on all parts
excluding consumables.
The warranty commences from the date of
dispatch from the manufacturer, and is subject
to the terms detailed within the Manufactures
‘conditions of business’.
Warranty is void if:
• Wiring is not in accordance with the
diagram provided with the heater.
• The unit is installed without proper
clearances required regardless of the
material being combustible.
• A fan model is connected to a duct system
or if the air delivery system is modified.
Location/Positioning
Under no circumstances should
any item be placed on or above
any part of the heater, whether it
is being used or not.
All basic criteria must be satisfied prior
to commencing the installation and
commissioning process.
The heater must be positioned and
installed to comply with all relevant
standards and guidelines. And should
also meet the local and national fire
regulations and insurance criteria. carefull
consideration should be taken when in
close proximity to high risk areas.
Gas-fired appliances are not
designed for use in hazardous
atmospheres containing
flammable vapours or combustible dust,
in atmospheres containing chlorinated or
halogenated hydrocarbons or in
applications with airborne silicone
substances.
Should overheating occur, or the gas
supply fail to shut off, shut off the manual
gas valve to the appliance before shutting
off the electrical supply.
General
This manual is an integral part of the heater,
therefore it should always be carefully kept
and it should always be provided together
with the heater, if it is transferred to another
owner or user. If this manual is damaged or
lost, a new one should be requested from
the installer or from the manufacturer. After
unpacking the product, please check the
contents to ensure all components are present.
If not, please contact your supplier.
The installation must be carried out by suitably
qualified personnel who, at the end of the
work, will commission the appliance and issue
to the owner a copy of the commissioning
report, which also confirms that the
installation is carried out in accordance with
regulations & standards applicable to the
country of use and in accordance with the
manufacturers instructions.
or premises by incorrect installation, settings,
maintenance or by improper use of the heater
is excluded.