COIL INSTALLATION

 WARNING:

ELECTRICAL SHOCK, FIRE OR 

EXPLOSION HAZARD

Failure to follow safety warnings exactly could result 

in serious injury or property damage.

Improper servicing could result in dangerous 

operation, serious injury, death or property damage.

•  Before servicing, disconnect all electrical power 

to the equipment.

•  When servicing controls, label all wires prior to 

disconnecting. Reconnect wires correctly.

•  Verify proper operation after servicing.

 CAUTION:

The coil must be level to ensure proper condensate 

drainage. An unlevel installation may result in 

structural damage, premature equipment failure, 

or possible personal injury.

General Information

C6 Series indoor cased coils are designed for upflow, 

downflow, or horizontal applications when used in conjunction 

with a horizontal drain pan kit. Accessory kits are not required 

for factory ready horizontal coils. See 

Table 1, (page 7)

 

or 

Table 2, (page 7)

. Coils are equipped with braze type 

refrigerant connections for easy installation.
•  Check the coils orifice size and confirm that it’s suitable 

for application with the intended outdoor unit. Depending 

on application, additional installer supplied orifice or TXV 

may be required.

•  Optional cooling/heating equipment must be properly sized 

and installed in accordance with the furnace manufacturer’s 

specifications and approved recommendations.

•  “Heating Only” furnace air circulators may have to be 

replaced with multi-speed heating / cooling blowers to 

upgrade the air delivery (CFM) when an add-on coil is 

installed. Refer to 

Table 1

 or 

Table 2

 for coil specifications, 

recommended CFM, and allowances for pressure drop 

across the coil and filters.

•  Verify that the air delivery of the furnace/air handler is 

adequate to handle the static pressure drop of the coil, 

filter, and duct work.

•  If precise forming of refrigerant lines is required, a copper 

tubing bender is recommended. Avoid sharp bends and 

contact of the refrigerant lines with metal surfaces.

•  Refrigerant lines should be wrapped with pressure sensitive 

neoprene or other suitable material where they pass against 

sharply edged sheet metal.

•  Horizontal installations require a horizontal drain pan kit 

to be installed. See 

Table 1

 for available part numbers.

•  Close-off plates are available in some air filter kits. Refer 

to the Replacement Parts List for available part numbers. 

Install the necessary close-off plates around the refrigerant 

lines and drain line where required.  Reinstall all inner and 

outer panels of the furnace/air handler that were previously 

removed when installing the indoor coil.

Upflow Installations

1. Disconnect all electrical power to the furnace.

2. Install the coil case on the furnace air discharge opening 

and level it as needed to ensure proper condensate 

drainage. If needed, use one of the coil case adapter 

kits to match the coil to the air discharge opening. See 

 

Figure 2 (page 6)

 for coil dimensions.

3. Seal the enclosure as required to minimize air leakage.

4. Connect the refrigerant lines as outlined in the Refrigerant 

Line Connection section.

Horizontal Installations

C6 coils can be installed horizontally, but it is required that 

the furnace and coil cabinets be securely mounted together 

before setting in place. A horizontal drain pan kit must also 

be installed under the coil. Refer to 

Table 1

 for available 

part numbers.

Horizontal Left Installations

1. Disconnect all electrical power to the furnace.

2. Remove the coil access door.

3. Remove the plug and knockout from one of the threaded 

holes in the horizontal drain pan.

 CAUTION:

The knockout must be removed and discarded 

to ensure proper condensate drainage. Improper 

drainage may result in structural damage, premature 

equipment failure, or possible personal injury.

4. Install plug (from horizontal drain pan) in the open drain 

hole in the drain pan at the bottom of the unit. This will 

block bypass air from entering the system.

5. Remove the drain line knockout from the coil access door. 

This will allow access to the horizontal drain.

6. Install drain pan extension (if supplied with unit).
 

NOTE:

 The holes in the drain pan extension should be 

pressed over the nibs molded into the drain pan. Which 

pair of holes to use will depend on whether the unit is 

installed horizontal left or horizontal right. Verify proper 

positioning for clearance thru the top of the coil cabinet 

before affixing. The drain pan extension can be installed 

and removed after the ductwork has been attached to the 
cased coil.

7. Connect the refrigerant lines as outlined in the Refrigerant 

Lines Connection section.

8. Seal the enclosure as required to minimize air leakage.

9. Reinstall the coil access door.

10. Restore electrical power to the furnace.

Horizontal Right Installations

1. Disconnect all electrical power to the furnace.

2. Remove the coil access door.

3. Remove the plug and knockout from one of the threaded 

holes in the horizontal drain pan.

Summary of Contents for C6BA Series

Page 1: ...ntion to all safety warnings and any other special notes highlighted in the manual Improper installation of the furnace or failure to follow safety warnings could result in serious injury death or pro...

Page 2: ...Unqualified individuals should not attempt to interpret these instructions or install this equipment If you do not posses mechanical skills ortools callyourlocaldealerforassistance Under no circumsta...

Page 3: ...ssaryclose offplatesaroundtherefrigerant lines and drain line where required Reinstall all inner and outerpanelsofthefurnace airhandlerthatwerepreviously removed when installing the indoor coil Upflow...

Page 4: ...2 Verify pressurization by depressing the Schrader valve on the end of the liquid line Listen for any escaping gas If there is no pressure test the coil for leakage If leakage is found clearly mark th...

Page 5: ...y the grommet is evenly aligned around the tube and securely positioned in the door cutout COMPLETING THE INSTALLATION 1 Position the drain pan so the connections are aligned with the corresponding kn...

Page 6: ...Coil Dimensions W HS HL H 5 8 4 17 3 4 20 3 4 FRONT VIEW TOP VIEW Distributor Thermal Expansion Valve TXV Door TXV Retaining Nut Liquid Line Stub w Screen Accessory Retaining Nut Grommet Figure 3 TXV...

Page 7: ...IONS MODEL C6BH 1 2 T24 A X24 A T30 A X30 A X35 A T24 B X24 B X26 B T30 B X30 B X35 B T36 B X36 B T42 B X42 B T36 C X36 C T42 C X42 C T48 C X48 C T60 C X60 C T42 D X42 D T48 D X48 D T60 D X60 D N omin...

Page 8: ...8...

Page 9: ...on tous les avertissements de s curit et toute autre remarque sp ciale donn e dans le manuel L installation inappropri e de la fournaise ou le non respect des avertissements de s curit risque d entra...

Page 10: ...endant son installation son entretien et son utilisation Les personnesnonqualifi esnedoiventpastenterd interpr ter ces instructions ou d installer cet quipement Si vous ne poss dez pas les comp tences...

Page 11: ...la Liste des pi ces de rechange pour les num ros de pi ces disponibles Installez les plaques de fermeture requises autour des conduites de frigorig ne et conduites d vacuation au besoin R installez to...

Page 12: ...bout de la conduite de liquide coutez pour d tecter toute fuite de gaz S il n y a pas de pression v rifiez s il y a une fuite dans le serpentin Si une fuite est d tect e marquez clairement l emplaceme...

Page 13: ...nt dans l entr e d fon able de la porte FINALISATION DE L INSTALLATION 1 Positionnez le plateau de d givrage de mani re ce que les raccords soient align s avec les d bouchures correspondants 2 V rifie...

Page 14: ...4 20 3 4 VUE AVANT VUE DE DESSUS Distributeur D tendeur thermostatique TXV Serrure crou de retenue du d tendeur thermostatique Embout de la conduite de liquide avec tamis crou de retenue d accessoire...

Page 15: ...X35 A T24 B X24 B X26 B T30 B X30 B X35 B T36 B X36 B T42 B X42 B T36 C X36 C T42 C X42 C T48 C X48 C T60 C X60 C T42 D X42 D T48 D X48 D T60 D X60 D Capacit nominale BTUH 3 24 000 30 000 36 000 24 0...

Page 16: ...ubjecttochangewithoutnoticeorincurringobligations 10 22 O Fallon MO Nortek Global HVAC LLC 2022 All Rights Reserved Sp cifications et illustrations sujettes changements sans pr avis ou sans aucune obl...

Reviews: