![Nortec UL60 Operation Manual Download Page 23](http://html1.mh-extra.com/html/nortec/ul60/ul60_operation-manual_1705755023.webp)
6 Handling
Selftest
©
Nortec Electronics 2018
23
6.2 Selftest
Power I – O: switch on I “In operation”
The display is illuminated.
After switching on the supply voltage on the display for 2 seconds you will see the following:
Copyright of the manufacturer
Device type
Software version
Software date
Test status
Battery charger and tester UL60
Software UL60 V1.39 16.11.17 TEST OK
Simultaneously a signal announces that the device is ready for use.
In case the result of the selftest is a failure within the device the following information is shown on
the display:
This message is always in English language.
FAILURE : EQUIPMENT
KEYBORD