![Nortec UL10 Operation Manual Download Page 58](http://html1.mh-extra.com/html/nortec/ul10/ul10_operation-manual_1705753058.webp)
CHARGER / DISCAHRGER UL10
OPERATION MAUNAL
©
NorTec Electronics 2014
57
7.20 Program 416. Maintenance – Pb battery vented commercial
Stage
name
Maximum
duration
Program
number
416
Operation
number
4
Operation
type
Maintenance
Battery
type
Lead
acid
Manufacturing
process
Liquid
electrolyte
Access
to
valves
open
Battery
type
16
Minimum
battery
capacity
10 Ah
Maximum
battery
capacity
400 Ah
Minimum
battery
voltage
2
Maximum
battery
voltage
30
Maximum number of batteries
15
Stage 1 (
S1
)
Discharge
Electrolyte
level
Sound signal
equalization
Stage 1 (
S1
)
Discharge
Discharge
current
0.05
24h
а
= x
С
(A)
Stage 1 (
S1
)
Discharge
Discharge
depth 1.5
24
h
V/battery
Stage 2 (
S2
)
Precharge
Voltage
charging
а
2.4 2
h
Umax = V/battery
Stage 2 (
S2
)
Precharge
Ia
=
x
С
(A)
Х
=0.25
2 h
Stage 3 (
S3
)
I-Charge
1
Current
=
x
С
(A)
Х
= 0.25
8 h
Stage 3 (
S3
)
I-Charge
1
Umax
=
V/battery
2.4
8
h
Stage 4 (
S4
)
U-Charge 1
Umax = V/battery
2.4
8 h
Stage 4 (
S4
)
U-Charge
1
I
а
= x
С
(A)
0.04
8
h
Stage 4 (
S4
)
U-Charge
1
Umax
=
V/battery
2.4
8
h
Stage 5 (
S5
)
Discharge
Discharge
current
0.05
24
h
а
= x
С
(A)
Stage 5 (
S5
)
Discharge
Discharge
depth
1.5
24
h
V/battery
Stage 6 (
S6
)
I-Charge
2
Current
=
x
С
(A)
0.25
8 h
Stage 6 (
S6
)
I-Charge
2
Umax
=
V/battery
2.4
8
h
Stage 7 (
S7
)
U-Charge
2
Umax
=
V/battery
2.4
8
h
Stage 7 (
S7
)
U-Charge
2
I
а
= x
С
(A)
0.04
8
h
Stage 8 (
S8
)
U-Charge 3
Umax = V/battery
2.4
2 h
Note: when the maximum output current of the device is exceeded the maximum time parameters
change accordingly.