CHARGER / DISCAHRGER UL10
OPERATION MAUNAL
©
NorTec Electronics 2014
27
(1) starts the checking process from the first stage of the program : discharge by 5-hour current. The
protocol is not printed out usually. Still it can be printed out at any moment of time by hitting the
key (P).
During the first print-out the lacking data are requested:
•
the battery number
•
the operator identification number
and the last data input appears as a tentative setting.
After the input is confirmed by hitting ENTER
↵
the protocol is printed out together with its relevant
heading.
The subsequent print-outs can be produced by hitting the key (
Р
) once again. The reference «Addi-
tionally printed out» is printed in the acknowledgement and the current parameters are indicated.