(2) If the SAM-e is condensing inside the duct, make sure that the design conditions have
not changed.
(3) If grommets leak, make sure the tubes are firmly inserted, if cracks or damage are
found, replace grommet.
4. BLOWER PACKS TROUBLESHOOTING
A.
PROCEDURE
(1) An optional blower pack (BP), ensure power supplied to blower pack either from
humidifier or other source, if present, gets its primary voltage from inside the humidifier.
This way, only one external power source has to be connected to the equipment.
Confirm this power source before troubleshooting the blower pack.
(2) Ensure blower pack is installed per Chapter 10-10 Installation.
(3) If fans are not functioning, confirm safety is not open. Fans are only ON when steam is
being discharged.
5. DIGITAL ON/OFF HUMIDISTAT SENSOR CALIBRATION
A.
PROCEDURE
(1) The humidity sensor is factory calibrated, however, it can be field recalibrated.
(a) The calibration routine can be accessed by pressing and holding down the option
button for five seconds. A new screen will appear with the calibration adjustments.
(b) Press the up
or down
buttons until the text
calH
appears on the LCD screen.
(c) To adjust the calibration press the Option
button. The screen should load to
display the current calibration trim. The calibration trim can be adjusted by
pressing the up or down buttons to the desired level and then pressing the option
button to confirm the settings.
(d) Press the Power
button to return to the normal display.
NOTE
A properly calibrated hygrometer should be used in conjunction with any calibration
procedure.
Summary of Contents for NH Series
Page 1: ...Manual No H 101 2006 09 15 NH Series ELECTRODE STEAM HUMIDIFIER Installation Manual TM ...
Page 9: ...10 00 Page 1 2006 09 15 10 00 INTRODUCTION ...
Page 10: ...10 00 Page 2 2006 09 15 Figure 1 NHTC ...
Page 14: ...10 00 Page 6 2006 09 15 Figure 6 Typical NHTC Installation Sheet 1 of 2 ...
Page 15: ...10 00 Page 7 2006 09 15 Figure 6 Typical NHTC Installation Sheet 2 of 2 ...
Page 16: ...10 00 Page 8 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 17: ...10 10 Page 1 2006 09 15 10 10 INSTALLATION PROCEDURES ...
Page 20: ...10 10 Page 4 2006 09 15 Figure 3 Water Drain and Supply Connection ...
Page 41: ...10 10 Page 25 2006 09 15 Figure 24 Typical SAM e Duct Installation ...
Page 45: ...10 10 Page 29 2006 09 15 Figure 27 Drain Water Cooler Option Installation with SAM e ...
Page 48: ...10 10 Page 32 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 49: ...10 20 Page 1 2006 09 15 10 20 OPERATION ...
Page 54: ...10 20 Page 6 2006 09 15 Figure 6 Basic Steam Production Method ...
Page 56: ...10 20 Page 8 2006 09 15 Figure 7 Software Flow Chart Sheet 1 of 7 ...
Page 57: ...10 20 Page 9 2006 09 15 Figure 7 Software Flow Chart Sheet 2 of 7 ...
Page 58: ...10 20 Page 10 2006 09 15 Figure 7 Software Flow Chart Sheet 3 of 7 ...
Page 59: ...10 20 Page 11 2006 09 15 Figure 7 Software Flow Chart Sheet 4 of 7 ...
Page 60: ...10 20 Page 12 2006 09 15 Figure 7 Software Flow Chart Sheet 5 of 7 ...
Page 61: ...10 20 Page 13 2006 09 15 Figure 7 Software Flow Chart Sheet 6 of 7 ...
Page 62: ...10 20 Page 14 2006 09 15 Figure 7 Software Flow Chart Sheet 7 of 7 ...
Page 72: ...10 20 Page 24 2006 09 15 Figure 14 NORTEC OnLine Status Page ...
Page 73: ...10 30 Page 1 2006 09 15 10 30 MAINTENANCE PROCEDURES ...
Page 79: ...10 40 Page 1 2006 09 15 10 40 TROUBLESHOOTING ...
Page 91: ...10 50 Page 1 2006 09 15 10 50 TECHNICAL ...
Page 95: ...10 50 Page 5 2006 09 15 Figure 4 NHTC NHPC Wiring Diagram ...
Page 108: ...10 50 Page 18 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...