10-10
Page 8
2006-09-15
Table 4. Recommended Condensate Line at Distributor(s)
Table 5. Equivalent Length Elbow and T-Fittings
Table 6. Humidifier and Distributor Inlet/Outlet Sizes
Dispersion Method
Condensate Hose
Copper Tube
Stainless Steel Tube
1 x Steam Distributor
0.375 in.
NORTEC 132-8840
0.250 in. MED-L Tubing
(0.375 in. OD)
0.375 in. Tube 0.049 in.
thick.
3 x Steam Distributor*
0.375 in.
NORTEC 132-8840
0.500 in. MED-L Tubing
(0.875 in. OD)
0.650 in. Tube 0.049 in.
thick
NOTE:
*When using more than one distributor, the condensate line must be trapped before it is joined together. See
Figure 4.
Nominal Tube Diameter
Standard 90 Degree Elbow
Standard 45 Degree Elbow
Side Outlet Tee
0.750/ 0.875 in.
2 ft
1 ft
4 ft
1.500/1.750 in.
3 ft 6 in.
1 ft 9 in.
7 ft
2.000/2.500 in.
4 ft 6 in.
2 ft 3 in.
10 ft
Humidifier
Steam Outlet
Distributor
Steam Inlet
NH 5-30
0.875 in. OD
ASD, BSD
0.875 in.OD
NH 50-100
1.75 in. OD
CSD
0.875 in. OD
NH 150-200
TWO 1.75 in.OD
BLOWER PACK
1.75 in.OD
SAM-e
1.75 in. OD*
mini SAM-e
0.875 or 1.75 in. OD**
NOTE:
*
SAM-e may have multiple 1.75 in. inlets depending on order.
**Mini SAM-e inlet is determined on order and may have two 1.75 in. OD inlets.
Summary of Contents for NH Series
Page 1: ...Manual No H 101 2006 09 15 NH Series ELECTRODE STEAM HUMIDIFIER Installation Manual TM ...
Page 9: ...10 00 Page 1 2006 09 15 10 00 INTRODUCTION ...
Page 10: ...10 00 Page 2 2006 09 15 Figure 1 NHTC ...
Page 14: ...10 00 Page 6 2006 09 15 Figure 6 Typical NHTC Installation Sheet 1 of 2 ...
Page 15: ...10 00 Page 7 2006 09 15 Figure 6 Typical NHTC Installation Sheet 2 of 2 ...
Page 16: ...10 00 Page 8 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 17: ...10 10 Page 1 2006 09 15 10 10 INSTALLATION PROCEDURES ...
Page 20: ...10 10 Page 4 2006 09 15 Figure 3 Water Drain and Supply Connection ...
Page 41: ...10 10 Page 25 2006 09 15 Figure 24 Typical SAM e Duct Installation ...
Page 45: ...10 10 Page 29 2006 09 15 Figure 27 Drain Water Cooler Option Installation with SAM e ...
Page 48: ...10 10 Page 32 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 49: ...10 20 Page 1 2006 09 15 10 20 OPERATION ...
Page 54: ...10 20 Page 6 2006 09 15 Figure 6 Basic Steam Production Method ...
Page 56: ...10 20 Page 8 2006 09 15 Figure 7 Software Flow Chart Sheet 1 of 7 ...
Page 57: ...10 20 Page 9 2006 09 15 Figure 7 Software Flow Chart Sheet 2 of 7 ...
Page 58: ...10 20 Page 10 2006 09 15 Figure 7 Software Flow Chart Sheet 3 of 7 ...
Page 59: ...10 20 Page 11 2006 09 15 Figure 7 Software Flow Chart Sheet 4 of 7 ...
Page 60: ...10 20 Page 12 2006 09 15 Figure 7 Software Flow Chart Sheet 5 of 7 ...
Page 61: ...10 20 Page 13 2006 09 15 Figure 7 Software Flow Chart Sheet 6 of 7 ...
Page 62: ...10 20 Page 14 2006 09 15 Figure 7 Software Flow Chart Sheet 7 of 7 ...
Page 72: ...10 20 Page 24 2006 09 15 Figure 14 NORTEC OnLine Status Page ...
Page 73: ...10 30 Page 1 2006 09 15 10 30 MAINTENANCE PROCEDURES ...
Page 79: ...10 40 Page 1 2006 09 15 10 40 TROUBLESHOOTING ...
Page 91: ...10 50 Page 1 2006 09 15 10 50 TECHNICAL ...
Page 95: ...10 50 Page 5 2006 09 15 Figure 4 NHTC NHPC Wiring Diagram ...
Page 108: ...10 50 Page 18 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...