INTRODUCTION
1. PREINSTALLATION
A.
RECEIVING & UNPACKING EQUIPMENT
(1) Check packing slip to ensure ALL material has been delivered.
(2) All material shortages are to be reported to NORTEC within 48 hours from receipt of
goods. NORTEC assumes no responsibility for any material shortages beyond this
period.
(3) Inspect shipping boxes for damage and note damages on shipping waybill accordingly.
(4) After unpacking, inspect equipment for damage and if damage is found, notify the
shipper promptly.
(5) All NORTEC products are shipped on an FOB factory basis. Any and all damage,
breakage or loss claims are to be made directly to the shipping company.
2. PACKAGING
A.
GENERAL
(1) The equipment packaging is standardized in that each box in the shipment will always
have the same contents. The following paragraphs identify the contents of each box.
B.
HUMIDIFIER AND CONTROLS BOX
(1) The typical equipment found in the humidifier and controls box is shown in Figure 2.
The contents of the box are listed on the box. If controls are ordered they will be listed
and small accessories that fit into the box will also be listed on the box.
C.
DISTRIBUTOR BOX
(1) Depending on the equipment ordered any of the following distributor box configurations
may be received:
(a) For equipment received if an ASD, BSD, CSD distributor(s) is ordered refer to
Figure 3.
(b) For equipment received if a SAM-e distributor is ordered refer to Figure 4.
(c) For equipment received if a RMBP is ordered refer to Figure 5.
D.
ACCESSORIES BOX
(1) Additional accessories such as DWC, DWSP, Filter, and Fill cup extension kits are
shipped in a separate box. Smaller accessories that would fit in the humidifier box are
put in the humidifier box and the box is identified as containing such.
Summary of Contents for NH Series
Page 1: ...Manual No H 101 2006 09 15 NH Series ELECTRODE STEAM HUMIDIFIER Installation Manual TM ...
Page 9: ...10 00 Page 1 2006 09 15 10 00 INTRODUCTION ...
Page 10: ...10 00 Page 2 2006 09 15 Figure 1 NHTC ...
Page 14: ...10 00 Page 6 2006 09 15 Figure 6 Typical NHTC Installation Sheet 1 of 2 ...
Page 15: ...10 00 Page 7 2006 09 15 Figure 6 Typical NHTC Installation Sheet 2 of 2 ...
Page 16: ...10 00 Page 8 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 17: ...10 10 Page 1 2006 09 15 10 10 INSTALLATION PROCEDURES ...
Page 20: ...10 10 Page 4 2006 09 15 Figure 3 Water Drain and Supply Connection ...
Page 41: ...10 10 Page 25 2006 09 15 Figure 24 Typical SAM e Duct Installation ...
Page 45: ...10 10 Page 29 2006 09 15 Figure 27 Drain Water Cooler Option Installation with SAM e ...
Page 48: ...10 10 Page 32 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 49: ...10 20 Page 1 2006 09 15 10 20 OPERATION ...
Page 54: ...10 20 Page 6 2006 09 15 Figure 6 Basic Steam Production Method ...
Page 56: ...10 20 Page 8 2006 09 15 Figure 7 Software Flow Chart Sheet 1 of 7 ...
Page 57: ...10 20 Page 9 2006 09 15 Figure 7 Software Flow Chart Sheet 2 of 7 ...
Page 58: ...10 20 Page 10 2006 09 15 Figure 7 Software Flow Chart Sheet 3 of 7 ...
Page 59: ...10 20 Page 11 2006 09 15 Figure 7 Software Flow Chart Sheet 4 of 7 ...
Page 60: ...10 20 Page 12 2006 09 15 Figure 7 Software Flow Chart Sheet 5 of 7 ...
Page 61: ...10 20 Page 13 2006 09 15 Figure 7 Software Flow Chart Sheet 6 of 7 ...
Page 62: ...10 20 Page 14 2006 09 15 Figure 7 Software Flow Chart Sheet 7 of 7 ...
Page 72: ...10 20 Page 24 2006 09 15 Figure 14 NORTEC OnLine Status Page ...
Page 73: ...10 30 Page 1 2006 09 15 10 30 MAINTENANCE PROCEDURES ...
Page 79: ...10 40 Page 1 2006 09 15 10 40 TROUBLESHOOTING ...
Page 91: ...10 50 Page 1 2006 09 15 10 50 TECHNICAL ...
Page 95: ...10 50 Page 5 2006 09 15 Figure 4 NHTC NHPC Wiring Diagram ...
Page 108: ...10 50 Page 18 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...