65
Vent terminal installation precautions
Note the following vent terminal installation
requirements.
1) Do not install the vent terminal indoors
2) Install the vent terminal with a downward slope
3) Install with the proper length protruding through the wall
4) Avoid installing the terminal where obstacles will block it
• This restriction will not be applied to an area
where an effective shield makes a clearance of
600mm (24") or more in front of the exhaust outlet.
Above
There must be a
clearance of
600mm (24") or
more in front of the
vent terminal.
Vent terminal
3.
Installation Requirements
Caution
sloping
up
sloping
down
The red line is
not visible.
Distance A
600mm (24")
or more
300mm (12")
or more
If the front wall is
flammable.
If the front wall is
nonflammable.
Vent terminal
Vent terminal
300mm (12")
or more
300mm (12")
or more
300mm (12")
or more
Vent terminal
300mm (12")
or more
Sides
Below
Vent terminal
300mm (12")
or more
Vent terminal
A
Front
Vent terminal
Vent terminal
300mm (12")
or more
300mm (12")
or more
There must be no
building opening
within this area.
Flue terminal
Vent Terminal Clearance Requirements
Clearances from obstacles Clearances from combustibles
Clearances from combustibles
not far
enough
too far
The red rectangle
is visible.
Proper installation. The
red line is visible, but the
red rectangle in not
visible from the outdoors
Snow
drift
Tree
Gasoline
Gas
Clearance between two terminals
Vent
terminal
300mm (12")
or more
300mm (12")
or more
300mm (12")
or more
SAR8210̲063̲070̲E̲J.p65
05.11.29, 3:06 PM
65
Summary of Contents for N-084M-DV-CA
Page 77: ...77 SAR8210 077 079 E J p65 06 1 13 6 15 PM 77...
Page 78: ...78 SAR8210 077 079 E J p65 05 11 29 3 06 PM 78...
Page 79: ...79 SAR8210 077 079 E J p65 05 11 29 3 06 PM 79...
Page 156: ...77 SAR8199 077 079 F E J p65 06 1 13 6 20 PM 77...
Page 157: ...78 SAR8199 077 079 F E J p65 05 11 29 11 37 AM Page 78 Adobe PageMaker 6 5J PPC...
Page 158: ...79 SAR8199 077 079 F E J p65 05 11 29 11 37 AM Page 79 Adobe PageMaker 6 5J PPC...