
20
Step
Installation Procedure(ex. @Garage)
Necessary Tool
20 See below chart and set
"
⑩
Coupler O-Ring"
and
"
⑨
Coupler Retainer"
onto the tip of
"
③
Flex Pipe"
in the correct direction.
⑨
Coupler
Retainer
⑩
Coupler
O-Ring
21 Pull out assembled
"
⑧
Rigid 45 Elbow Set"
, which are tentatively locked to the
equipment's vent connector pipe. Connect by matching pulled out assembly and 3 lock
clasps of
"
⑨
Coupler Retainer"
, which was set during the previous process.
* Prior to connecting, make sure to apply
"
⑭
O-ring lubricant"
to
"
⑩
Coupler
O-Ring
".
⑧
Rigid 45
Elbow Set
⑭
O-ring
lubricant
Step-3
(W
ork where equipment is installed)
When inserting,
"
⑩
Coupler O-Ring"
is easy to tear due to pinching.
Therefore, take maximum precaution when working.
Be sure to do
[Point]
Correct way of setting
"
⑩
Coupler O-Ring"
and
"
⑨
Coupler Retainer"
.
[Point]
When matching the lock of
"
⑧
A. Coupler Fitting"
and
"
⑨
Coupler Retainer"
, it is easier to match the lock clasp by
turning the
"
⑨
Coupler Retainer"
by hand.
Vent Connector Pipe
Lock Clasp
(3 Places)