
13
Step
Installation Procedure(ex. @Garage)
Necessary Tool
8 Take extra care to ensure that the
"
③
Flex Pipe 2""
does not slip by checking the mark you made
on the
"
③
Flex Pipe 2""
. Firmly tighten
"
③
Flex Pipe 2""
with
"
⑥
C. Flex Pipe Clamp"
, but be
careful not to over tighten as it may distort the
"
③
Flex Pipe 2""
. Check to see if it is firmly secured
by pulling it by hand.
* The tightening torque should be between 7 and 10 in lb.
* The assembly image figure for all parts in below Step 2 (Procedure 9–14)
Use this Image to check for correct assembly of the components.
9 Grab
Bag Labeled "Step-2"
and necessary tools for this step of the installation.
Climb up on the roof and access the Rain Cap.
Ladder
Wet Towel
Marker
Bag"Step-2"
Step-1
(W
ork where equipment is installed)
Step-2
(W
ork on rooftop)
[Point]
When climbing up on the roof, use appropriate fall protection to guard against falls. Make
sure that safety comes first at your own risk.
Final drawing in this Step2
(a cross section)
Final image in Step 2
Flat head
Screwdriver
Box wrench
(5/16")
or
PVC Cutter
Box Cutter
or
Step-2
䐡
Flex Pipe 2”
䐠
Top Flex Support
䐟
Universal Rain Cap