
19
Step
Installation Procedure(ex. @Garage)
Necessary Tool
18 Pull
"
⑦
Flex Sleeve"
over
"
③
Flex Pipe 2""
under the ceiling. Then, push into the bottom of
"
⑥
Base Junction Support"
. And check that
"
③
Flex Pipe 2""
is sticking out from
"
⑦
Flex
Sleeve"
. (If it is not sticking out,cut
"
⑦
Flex Sleeve"
until
"
③
Flex Pipe 2""
sticks out.)
⑦
Flex Sleeve
* Do not extend the
"
⑦
Flex Sleeve"
if it needs to be cut, it should be cut while in its
compressed state.
19 Firmly tighten
"
⑥
B. Flex Sleeve Clamp"
of
"
⑥
Base Junction Support"
, but be careful
not to tighten too much as it may distort the
"
⑦
Flex Sleeve"
and rubber. Check to see if
it is firmly fixed by pulling it by hand.
* The tightening torque shall be between 7 and 10 in lb.
Step-3
(W
ork where equipment is installed)
Pay attention not to get injured from the sharp edge of
"
⑦
Flex Sleeve"
.
WARNING
OK
NG
Flat head
Screwdriver
Box wrench
(5/16")
or
[Point]
"
③
Flex Pipe 2""
not visible.
[Point]
"
③
Flex Pipe 2""
is visible.