2. Free the shielding of the CAN BUS cable(s) (shielded four-wire cable, 0.34 mm
2
per wire) by removing
the insulation from the appropriate clamping position to the end of the cable. Remove the exposed
shielding to about 2 cm, then fix the end of the remaining shielding with a piece of shrink tubing as
shown in
and secure the exposed shielding with the shielding clamp(s) to the housing.
In-wall cable routing
On-wall cable routing
Stripped-down shielding
shrinkable tubing
Cable wires
Fig. 15: Fixing the exposed shielding of the CAN BUS cable(s) to the housing with the shielding
clamp(s)
Summary of Contents for SPA Display
Page 1: ...INSTALLATION AND OPERATION MANUAL Nordmann SPA Display 2591871 A EN 1903...
Page 32: ...Notes...
Page 33: ...Notes...
Page 34: ...Notes...
Page 35: ......