8
3. See the upper drawing. Identify the Left Pedal
Arm (9) and orient it as shown. Using a plastic
bag to keep your fingers clean, apply a generous
amount of the included grease to the axle on the
Left Pedal Arm.
See the lower drawing. Insert the axle on the
Left Pedal Arm (9) into the Left Leg (6) from the
direction shown.
Attach the Left Pedal Arm (9) with an
M8 x 14mm Shoulder Screw (82), an Outer
Pedal Cover (93), and a Pedal Arm Washer (89).
Attach the Right Pedal Arm (not shown) to
the Right Leg (5) in the same way.
3
30
1
2
30
53
30
30
2. With the help of a second person, lift the Frame
(2) and place some of the packaging materials
under each side of the Frame.
Next, orient the Base (1) so that the Leveling
Feet (53) are in the indicated locations. Then,
insert the Base into the Frame (2).
Tip: It may be helpful to have the second
person help you work each side of the Base
(1) into the Frame (2). It may also be helpful
to use a rubber mallet.
Attach the Base (1) with twelve M10 x 20mm
Screws (30); start all the Screws, and then
tighten them.
Then, remove the packaging materials from
under the Frame (1).
2
9
Grease
9
6
5
89
93
82