24
4.8
C
OMPLETING THE
I
NSTALLATION
1.
Start up your sprayer and test the
sprayer’s functionality. The NORAC
Control Panel does not need to be
powered up for the original switches to
function. Unfold the booms and
raise/lower each boom and main
section.
Confirm that the cabling/hoses
are agreeable to the entire range
of motion.
2.
If any functions do not work, review the
hydraulic and electrical portions of this
manual to check for proper installation.
If you still have trouble, contact
NORAC for assistance.
3.
Turn on the power for the UC4+
Control Panel using the switch on the
side of its chassis.
4.
Repeat the Boom Speed Test as
described in Section
4.2
Boom Speed
Test
with the NORAC UC4+ Spray
Height Control system installed.
Record the results for comparison in
Table 5.
5.
The procedure for the installation of the
UC4+ Spray Height Control system is
now complete. Begin the AUTOMATIC
SYSTEM SETUP procedure as described
in the
UC4+ Sprayer Boom Control
Operator’s Manual
(
M01
).
Summary of Contents for UC4+ Apache 2010+
Page 9: ...6 Figure 3 Hydraulic Plumbing Schematic ...
Page 28: ...25 5 ELECTRICAL REFERENCE CABLE DRAWINGS 5 1 ITEM C02 44668 CABLE SENSOR BRANCH ...
Page 29: ...26 5 2 ITEM C02B 44664 CABLE UC4 CAN NODE DUAL ...
Page 30: ...27 5 3 ITEM C03 44656D CABLE VALVE VARIABLE RATE DT ...
Page 31: ...28 5 4 ITEM C05 44674 CABLE UC4 SENSOR ROLL BIAS ...
Page 32: ...29 5 5 ITEM C10 44650 39 CABLE POWER GENERIC SELF PROPELLED L 100 2 54m ...
Page 33: ...30 5 6 ITEM C11 44651 03 CABLE VALVE EXTENSION GENERIC 365 9 27m ...
Page 34: ...31 5 7 ITEM C12 44658 91 CABLE UC4 VALVE AP3 MAIN ...
Page 35: ...32 5 8 ITEM C13 44658 90 CABLE UC4 SENSE AP3 ...
Page 36: ...33 5 9 ITEM C14 44658 99 CABLE UC4 INTERFACE POWER PIGTAIL FUSED ...