noken MARNE Manual Download Page 3

3

-Verificar el producto, y el perfecto estado de sus componentes antes de realizar la instalación. Si se 
advierte algún defecto, proceder a la reclamación antes de la instalación.

Advertencia:

 Es necesario, el acceso total a las partes no visibles de la bañera, con el fin de 

poder realizar futuras tareas de mantenimiento.

-Noken Design baths are manufactured to the strictest standards to ensure quality performance and full customer 
satisfaction at all times.
-Each and every one of our baths is assembled and tested before leaving the factory.
-All plumbing installation work should be effected in compliance with national regulations concerning plumbing 
installations in buildings.
-The system must only be installed by qualified professionals.
-The installation should be in accordance with the wiring regulations in force at your country. Make sure the circuit 
you are connecting to the whirltub, has been installed and protected to the installation standards in force at your 
country.
-Noken Design S.A. declines all responsibility in the event of improper installation.
-This bathtub can be used by children aged from 8 years and above and persons with reduced physical, sensory 
or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction 
concerning use of the appliance in a safe way and understand the hazards involved. Children shall not play with 
the appliance. Cleaning and user maintenance shall not be made by children without supervision.
-The maximum recommended water hardness for the range of baths is 18ºTH (French degree of hardness) / 13ºe 
(English degree of hardness).
-The baths are not designed to be used for seaweed, mud or seawater treatments, etc.
-There is an increased risk of falls when the surface of most baths is wet and therefore slippery. This is 
particularly true when soap, shampoo, bath oils and other similar products are used. Users of baths must be 
aware of this fact.
- Noken Design baths are manufactured to the strictest standards to ensure quality performance and full customer 
satisfaction at all times.
- Each and every one of our baths is assembled and tested before leaving the factory.
- All plumbing installation work should be effected in compliance with national regulations concerning plumbing 
installations in buildings.
- The bathtub must only be installed by trained plumbing engineers following strictly the manual guidelines.
- The installation should be in accordance with the wiring regulations in force at your country. Make sure the circuit 
you are connecting to the whirltub, has been installed and protected to the installation standards in force at your 
country.
-Disconnecting means must be incorporated into the fixed installation in accordance with the installation regulations
-If the power cord cable is damaged, it must be replaced by the Noken after-sales service or by similar qualified 
person in order to avoid a danger
- The parts that contain active parts, except those supplied with very low safety voltage that does not exceed 12 V, 
are inaccessible for a person inside the bathtub.
-The devices that are grounded must be permanently connected to a fixed electrical canalization
- The parts that include electrical components, are fixed so that they can not fall into the bathtub
- The devices should be powered by a residual current device (RCD) with a maximum residual current of 30mA
- Make an equipotential connection between the equipotential connection of the bathtub and the existing installation 
according to the regulations  in each country
-The recommended inlet pressure of cold / hot water must not be less than 2 bar. (200kpa).
-The recommended inlet pressure of hot / cold water must  not exceed 5 bar. (500kpa)
-The new hoses supplied with the appliance must be used. Old hoses should not be used.
- Noken Design S.A. declines all responsibility in the event of improper installation.

NB:

 Before proceeding with the installation, check that all the parts supplied are in perfect condition. Notify the 

carrier immediately if this is not the case.

Summary of Contents for MARNE

Page 1: ...retera CV 20 km 2 12540 Vila real Castell n Spain Tel 34 964 50 64 50 Fax 34 964 50 67 93 e mail noken noken com www noken com Marne MARNE CORNER MARNE CH AIR HY DRO FU AIR EVO MU SIC MARNE MARNE CORN...

Page 2: ...superando rigurosos controles t cnicos y de seguridad en nuestras instalaciones para verificar su correcto funcionamiento antes de salir de f brica La instalaci n de fontaner a debe hacerse de acuerdo...

Page 3: ...t be aware of this fact Noken Design baths are manufactured to the strictest standards to ensure quality performance and full customer satisfaction at all times Each and every one of our baths is asse...

Page 4: ...baignoires n ont pas t con ues pour les traitements aux algues aux boues aux eaux marines etc Lorsqu elle est humide la surface de la plupart des baignoires pr sente un risque potentiel accru de d rap...

Page 5: ...apacidades f sicas sensoriales ou mentais reduzidas ou falta de experi ncia e conhecimento se tem se lhes dado a supervis o ou forma o apropriadas com respeito ao uso do aparelho de uma maneira segura...

Page 6: ...devem ser usadas Noken Design S A declina qualquer responsabilidade por instala o incorreta Nota Verifique antes de instalar as pe as Caso contr rio reclame com a transportadora Nota Verifique os bens...

Page 7: ...xt 40 e t n e i l a c a u g a e d a m o T e t n e u q a u g a d a m o T a r f a u g a e d a m o T a i r f a u g a d a m o T e g a s e D a l u v l a V a c i r t c l e a m o T s a c i r t l e s e x e n...

Page 8: ...a e d a m o T a i r f a u g a d a m o T e g a s e D a l u v l a V a c i r t c l e a m o T s a c i r t l e s e x e n o C s n o i t c e n n o c r e t a w t o H e d u a h c u a e d e s i r P s n o i t c...

Page 9: ...9 1...

Page 10: ...10 2 3 3 4 G...

Page 11: ...instala o existente de acordo com as normas vigentes em cada pa s La presi n de entrada recomendada del agua fr a caliente no debe ser inferior a 2 bar 200kpa La presi n de entrada recomendada del agu...

Page 12: ...12 250021559 6B 250021559 6A 5...

Page 13: ...13 ECOLITE ECOLITE CORNER ECOLITE ECOLITE 250020731_N790001301 CH AIR HY DRO FU...

Page 14: ...ETOR AIR HIDRO AIR HIDRO JET MICRO JET DORSAL JET AIR HYDRO MICRO INJETOR DORSAL MASSAGE PROGRAMS PROGRAMAS MASAJE PROGRAMMES MASSAGE PROGRAMAS DE MASSAGEM SOUND SYSTEM SOUND SYSTEM SOUND SYSTEM SISTE...

Page 15: ...la ba era Bathtub do not have to be installed in environments where temperature may drop below 0 C as frozen pipes may damage the bathtub Les baignoires ne doivent pas tre install es des temp ratures...

Page 16: ...o y estar protegidas con un dispositivo de corriente residual RCD de 30 mA Zona 2 Los accesorios de iluminaci n de esta zona deben ser a prueba de salpicaduras Busque los s mbolos IP44 o superiores Zo...

Page 17: ...B Mains voltage fittings in this zone must be wired on a separate circuit and protected with a 30mA Resi dual Current Device RCD Zona 2 Light fittings in zone 2 must be splashproof Look for an IP numb...

Page 18: ..._________________________________ Pour le nettoyage de la baignoire employer des savons liquides et de l eau et utiliser des ponges ou linges non abrasifs Pour nettoyer n utiliser en aucun cas des pro...

Page 19: ...19...

Page 20: ...visitar nuestra web For a warranty or other information on this product visit our Web address Pour obtenir une garantie ou d autres informations sur ce produit visitez notre site web Para garantia ou...

Reviews: