MAINTENANCE
45
EZ Rider
t
HP 330780 (4--04)
MAINTENANCE CHART
NOTE: Check procedures indicated (
H
) after the first 50 hours of operation.
Interval
Key
Description
Procedure
Lubricant/
Fluid
No. of
Service
Points
Daily
1
Side and rear squeegees
Check for damage and wear
--
3
Check deflection and leveling
--
6
2
Scrub brushes
Check for damage, wear, debris
--
2
8
Recovery tank
Clean tank
--
1
8
Recovery tank, ES mode
Clean ES filter
--
1
7
Solution tank, ES mode
Clean solution supply filter
--
1
9
Vacuum fan inlet filter
Clean
--
1
--
Machine
Check for leaks
--
3
11
Cylindrical brushes only:
debris trough
Clean
--
1
15
FaST PAK supply hose
and connector (option)
Clean and connect hose to stor-
ing plug when not in use
--
1
50 Hours
5
Cylindrical brushes
Check taper and rotate front to
rear
--
2
10
Squeegee caster wheels
and pivot points
Lubricate
SPL
4
4
Battery cells
Check electrolyte level
DW
3
12
Disk scrub head floor skirts Check for damage and wear
--
2
16
FaST filter screen (option)
Clean
--
1
100 Hours
5
Cylindrical scrub brush
drive belts
Check tension
--
2
3
Steering caster pivot bear-
ing
Lubricate
SPL
1
9
Tank and vacuum fan seals Check for damage and wear
--
3
14
Tires
Check for damage and wear
--
3
200 Hours
4
Battery terminals and
cables
H
Check and clean
--
12
13
Brake
Check adjustment
--
1
6
Steering gear chain
Lubricate
GL
1
16
FaST air filter (option)
Clean
--
1
500 Hours
9
Vacuum fan motor
Check motor brushes
--
1 (2)
3
Steering gear chain
H
Check deflection
--
1
1000
Hours
5
Scrub brush motors
Check motor brushes
--
2
6
Propelling motor
Check motor brushes
--
1
LUBRICANT/FLUID
DW
Distilled water
. . . .
SPL
Special lubricant, Lubriplate EMB grease (NOBLES part no. 01433--1)
. . .
GL
SAE 90 weight gear lubricant
. . . .