B1
Box
B1
9
6
B1
B1
Upper
Lower
Step 7
Here, in Step 7, is a single-man job, in the assembly of the
Foot Base to the Pillar.
Keeping the
Pillar
in the same propped position from above, proceed to attach the
Foot Base ( B1 ).
Attach the
FOOT BASE ( B1 )
to the Pillar with
Screws (
⑥
).
Using the
Allen Wrench (
⑨
)
, secure and tighten all 3 ( three )
Screws (
⑥
)
into the base of the
Pillar
,
as shown above.
There are a total of 3 Screws to be affixed per Foot Base (B1).
Repeat this Step 7 for the remaining 2 ( two ) Pillars.
The completion of assembly
Steps 5, 6 and 7
here, is that you now have 3 ( three )
Pillars
, fully assembled
with
Foot Aprons with Foot Base.
Ensure all the Screws of these Foot Bases are FULLY SECURED AND TIGHTENED.
To assist the flow of assembly into a Pergola, you may place each Pillar to the previously marked locations.
Step 8
SAFETY REMINDER :
Upon completion at Step 7 above, you would have assembled all 3 (three )
Pillars, complete with
Foot Bases.
Before moving on to the next part of the
Pergola
assembly, go back and check and
ENSURE ALL BOLTS AND SCREWS at ALL ASSEMBLY POINTS for ALL 3 (three) Pillars,
are FULLY SECURED AND FULLY TIGHTENED into position AT ALL POINTS.
Here below in Step 9 & 10, involves the assembly of the
INNER and OUTER Joist to the Pillars.
The function of the
Inner and Outer Joists
will be attached to the
top of the pillars
to become
the core support for the
Roof Slats.
20 OF 46
Summary of Contents for TRIANGULAR PERGOLA
Page 37: ...37 OF 46 Step 25 E E 2 9 8 9 7 9 7 9 2 8...
Page 39: ...39 OF 46 Step 26 2 9 8 9 7 9 7 9 2 8...
Page 41: ...12 1 41 OF 46 G Step 27 12 1...
Page 44: ...12 1 44 OF 46 G 12 1...