
Use and Maintenance Manual model “B10 V ULISSE”
10
ENGLISH
3.7
UNPACKING THE PRODUCT
Packaging is composed of
boxes made with recyclable
cardboard - according to
RESY standards - and wooden
pallets. All packaging materials
can be re-used for similar purpose
or, if necessary, disposed of as
urban waste, in compliance with
current laws.
Remove the strap which binds
the pallet to the packaging and
lift the cardboard; remove the
plastic bag which wraps the
product, making sure it is intact.
Please handle the product using
a trolley, paying attention to
always keep the body in a ver-
tical position. Particularly, make sure that both the door
and its glass are protected against mechanical impact
which would compromise their integrity. If possible,
unpack the product near the area where it will be
installed. To remove the appliance from the pallet, it
is necessary to remove the four screws placed un-
der the pallet (Phillips-head screwdriver).
3.8
FIXING THE PRODUCT
The appliance can be installed in a pre-existing
chimney compartment or in a special compartment
built to measure and covered with drywall.
In case the product is accessible from the outside,
follow the procedure below to fix its base to the
compartment surface.
Before fixing the appliance, remember the following:
- prepare the chimney-flue connections, remembering
that the appliance is supplied with vertical discharge
because already equipped with the connection for
ash collection (Ø 80 male).
- set up the electrical system and/or make sure the
electrical cable to the external socket is placed safely.
Open the appliance by using the specific handle (to be
found in the box together with the instruction manual).
With your index finger, press down on the lever at the
lower right - under the handle’s hook – to unlock the
safety mechanism and let the appliance slide open.
1
2
1
2
Pay particular attention when sliding the product
open, as at this stage the base has not been fixed
to the compartment’s structure yet.
3.6 DOCUMENTS TO BE ISSUED
Once the installation has been carried out, the tech-
nician must provide to the user with the following:
•
use and maintenance booklet of the appliance
supplied by the manufacturer;
•
technical documents of all the accessories
used and subject to maintenance;
•
documents related to the exhaust system;
•
system booklet (when applicable);
• installation certificate;
Documentation useful for liability purposes
of the installer must include:
•
a detailed description (also including photo-
graphs) of the presence of other heat generators;
•
Declaration of Conformity of the system (M.D. 37/08);
•
general description, diagram or photographic
documentation of changes made to the system, if
any intervention is necessary during installation;
• Use of certified material with the CE mark
(305/2011);
•
possible instructions related to the warranty;
•
date and signature of the installer;
NOBIS SRL cannot be held in any way liable in the
event of non-compliance with the installation and
start-up standards of its products.
A
A
A-A
3
4
A
A
A-A
Unscrew the 4 wing-head thumb nuts and lift the
product to release the slider, which will be used to
fix the product to the base of the compartment.
3