Solar Collectors - APOLLON

Apollon Μeander AL GRD MDR

APOLLON MEANDER AL GRD MDR

LABELING

 

The collectors are identified by one sticker. On this sticker all the 

details of the collector are written. The information 

provided on the sticker is important for the future identification of 

the product.

INSTRUCTIONS FOR THE INTERCONNECTION OF COLLECTORS

IN SOLAR FIELDS

In a central collector bank, the maximum number of collectors, must not be greater than seven-eight (e.g. 14-16m

2

per row. The maximum number of collectors shouldn´t be greater than four-five per row in case of using a Drain Back 

system. The collector banks must be connected in parallel between themselves and at a distance of 90cm (when at 

an angle of 25°) to 120 cm (when at an angle of 40°). At the beginning and the end of each line, there must be a valve 

and a 3/4” x 1/2” x 3/4” T-piece for the installation of a submersible thermometer. In addition at the end of the last row, 

the differential thermostat sensor must be placed in place of the collector’s sensor (Ø8). 

RECOMMENDATIONS ON HEAT TRANSFER MEANS AND SAFETY AND 

PROTECTION MEASURES DURING FILLING, OPERATION AND MAINTENANCE 

OF THE SYSTEM.

For the protection of the collectors’ circuit from frost, a solution of water and propylene glycol is used, which is non-toxic, 

at a ratio suitable to provide frost protection down to -10° within the collector at an exterior temperature of -20°. Once 

the system has been placed and until the installation is complete the glass panels of the collectors must remain covered, 

until the boiler is filed with service water, so as to avoid the boiling of the filling liquid or the breakage of the glass.

The system must have the filling liquid replaced or topped up every 2-3 years. The filling must be accomplished with 

a suitably diluted liquid. In addition, the circuit needs the provision of a differential thermostat with a sensor for the 

protection of the circuit from frost which shall activate the circulation pump when the internal temperature r4°C.

Additionally, under no circumstances must the automatic filling valve be left open, as there is the danger that if the 

collector bank has a small leak at some point which is leaking water, the automatic filling valve (if left open) will 

continuously top up the system with water and so the ratio of the anti freeze liquid will be altered and the collectors 

may break at the first sign of frost.

Dimensions LxWxH (mm): 2010 x 1010 x 110

Overall area: 2,03 m²

Absorber area: 1,81 m²

Overall collector weight: 36 kg

Volume of heat transfer fluid: 1,70 lt

Absorber coating: High selective vacuum coating

Standstill temperature: XXX °C

Max. operating pressure: 0,8 MPa (8 bar)

Transparent cover: Tempered, low-iron solar glass

S/N: XXXXXX

Date: ΧΧ / ΧΧΧX

MADE IN EU

Flat meander solar collector AL GRD MDR

Summary of Contents for Apollon Meander AL GRD MDR

Page 1: ...Technical Manual Installation maintenance use instructions Solar collectors Meander AL GRD MDR ...

Page 2: ......

Page 3: ...R THE INTERCONNECTION OF COLLECTORS IN SOLAR FIELDS 7 RECOMMENDATIONS ON HEAT TRANSFER MEANS AND SAFETY AND PROTECTION MEASURES DURING FILLING OPERATION AND MAINTENANCE OF THE SYSTEM 7 MAXIMUM OPERATING PRESSURE PRESSURE DROP MAXIMUM AND MINIMUM ANGLE 8 GENERAL INSTALLATION RULES 9 INSTALLATION POSITION 10 GENERAL PREVENTION MEASURES 11 SUPPORT BASE PARTS 12 SUPPORT BASE ASSEMBLY ON A FLAT SURFACE...

Page 4: ... least 40 litres daily In order to take full advantage of the solar water heater maximum use of hot water should be made during daytime so that the system can continuously produce hot water during the daylight hours maintaining thus its maximum efficiency SOLAR WATER HEATING The collecting surface absorbs solar energy and heats the liquid water or antifreeze mixture that circulates in the water el...

Page 5: ...dow area as well as the headers thus increasing the collector s absorbency Laser Welded to the water frame 5 Special plastic parts for supporting and sealing the water frame to the trough specially designed for the collector s ventilation with sensor supporting option Special silicone rubber seals allow fluctuation of the absorber s length contraction expansion in a 40 C to 200 C temperature range...

Page 6: ...rom the collectors at the point of installation so as to protect them from shocks paying attention not to support the collectors on their pipe connections When the packaging materials are removed the collectors must be placed directly onto their supporting base which must be assembled according to the instructions in this leaflet FLAT SURFACE INCLINED SURFACE One type of supporting base system ele...

Page 7: ...table to provide frost protection down to 10 within the collector at an exterior temperature of 20 Once the system has been placed and until the installation is complete the glass panels of the collectors must remain covered until the boiler is filed with service water so as to avoid the boiling of the filling liquid or the breakage of the glass The system must have the filling liquid replaced or ...

Page 8: ...maximum yield The solar system must be oriented so that the collecting surface faces the geographical south for the northern hemisphere and the geographical north for the southern hemisphere i e it should always face the equator Any deviation in the orientation means a drop in the system s performance If a deviation from the correct orientation cannot be avoided then the system s performance must ...

Page 9: ...ons that apply As the sun ray s angle of attack varies with time but also depending on the system s location the collector s angle should be approximately equal to the installation location s latitude At this angle the maximum energy gain on an annual basis is achieved Installation particularities In case there is no compatibility between the surface where the collector will be installed inclined ...

Page 10: ...tion make sure that the roof and or the construction is of adequate bearing capacity in terms of statics always according to the expected maximum loads at the installation point If the installation is in a place with an extremely big wind and snow load the system as a whole should be statically checked by a skilled person e g a specialized engineer In special cases strengthening or more solid cons...

Page 11: ...ical devices and electrical tools against unintended activation y y Use only the tools intended to be used for this specific solar system The use of other components or inappropriate tools can cause accidents Requirements related to the personnel y y The installation of our Solar Thermal systems can only be undertaken by authorized specialized companies and trained personnel y y Works in electrica...

Page 12: ...2 5 847 5 1151 5 1178 5 1190 3 0 10 110 815 915 925 4 0 14 754 1978 2018 2048 2060 89 2 0 20 920 940 44 140 295 645 800 896 5 0 15 55 490 925 965 980 6 0 300 1200 1500 42 392 1108 1458 1 3 2 5 0 13 173 213 308 1752 1847 1887 2047 2060 0 11 5 38 5 342 5 847 5 1151 5 1178 5 1190 0 10 110 815 915 925 4 0 14 754 1978 2018 2048 2060 89 0 15 55 490 925 965 980 6 ...

Page 13: ...rew vertical part 3 to the above parts 3 Screw diagonal part 4 to the above parts and tighten all screws Repeat steps 1 2 3 for the other pairs of parts 4 Place parts 6 crosswise and tighten the screws 5 2 1 3 4 6 5 5 Screw the collector supporting part 5 to the bottom part of the frame and tighten the screws 6 Screw the collector supporting part 5 to the top part of the frame without tightening t...

Page 14: ...bottom right edge Connect the pipe to the system s heat exchanger outlet 12 Place a Ø22 mechanically tightened copper plugs on the upper right and bottom left edge of the collector s 13 Place the intermediate decorative channel optionally clasp the piping covers and fasten up the plugs at the bottom part Use lock nuts in order to avoid the copper tube mechanical strain STEP 10 STEP 11 STEP 7 STEP ...

Page 15: ...ape parts constructed in the former step 1 in order for the frame to be formed Screw straight parts 6 which will be used for the mounting of the support base to the tiles to the botton part Repeat for the rest of the parts 5 Bend the straight parts 6 of step 2 with the hand covering the beams of the tiled roof Drill and fasten up with bolts Use level so that the base is horizontally placed 3 Screw...

Page 16: ...and the sensor slot at the upper left part of the collector Connect the pipe to the system s heat exchanger inlet 9 Place a 3 4 Ø22 mechanically tightened at the collector bottom right edge for the connection of the boiler line Connect the pipe to the system s heat exchanger outlet 10 Place a Ø22 mechanically tightened copper plugs on the upper right and bottom left edge of the collector s 11 Plac...

Page 17: ... mains and to the consumption system inspection of the pipe insulation and cleaning of the glass y y If the collectors glass is broken it should be replaced immediately y y It is recommended that the glass is washed at an hour of low sunlight to avoid damages due to expansion contraction due to temperature changes y y If the fittings are worn screws pugs piping etc these should be replaced at the ...

Page 18: ...erly insulated Has the installment on the roof been done according to the local regulations HYDRAULIC CONNECTIONS Are there any leaks in the closed circuit the connections or in the tube heat exchanger Are the safety valves installed properly Does a mixing valve of hot cold water exist ELECTRICAL CONNECTION Is the electric resistance connected properly if it exists Has the electric connection been...

Page 19: ......

Page 20: ...100 Sofia Region Bulgaria Tel 359 2 4210232 email info nobel bg 11 18 Solar collectors Meander AL GRD MDR The company preserves the right to change all specifications of the products and their accessories without prior notice The company preserves the right to change all specifications of the products and their accessories without prior notice ...

Reviews: