18
Solar Collectors - APOLLON
INSTRUCTIONS FOR THE INSTALLER
After the installation is complete, the installer, with the help of the check list below has to check all of the points which
are noted and mark in the relevant column with a √.
LIST
CHECK
COLLECTORS AND EXTERNAL PIPING
Is the installation and the fixing of the support base according to the instructions and local regulations?
Is there an ideal location and facing of the collectors?
Is there humidity inside the collectors?
Are the hydraulic connections of the collectors correct?
Has there been good UV protection on the thermal insulation?
Is the piping properly insulated?
Has the installment on the roof been done according to the local regulations?
HYDRAULIC CONNECTIONS
Are there any leaks in the closed circuit, the connections, or in the tube heat exchanger ?
Are the safety valves installed properly?
Does a mixing valve of hot / cold water exist?
ELECTRICAL CONNECTION
Is the electric resistance connected properly? (if it exists)
Has the electric connection been done according to the local regulations? (insulation, grounding, etc...)
GENERAL
Was the guarantee properly filled in and given to the client?
Were the instructions of use given to the client?
Was the proper selection of the model made according to the needs of the client?
Was the client informed of other options for the production of hot water?
Distributor Data
Full name
.....................................................................
Address
........................................................................
Telephone
.....................................................................
Installer Data
Full name
.....................................................................
Address
........................................................................
Telephone
.....................................................................