15
Solar Collectors - APOLLON
Apollon Μeander AL GRD MDR
APOLLON MEANDER AL GRD MDR
SUPPORT BASE ASSEMBLY ΟΝ ΑΝ INCLINED SURFACE
ATTENTION!
After the installation check that the collectors surface has a tilt angle to the horizontal position of
geographical latitude ±5°.
1.
Screw part
1
to part
2
, using the M8 screws and nuts included in the packaging. Repeat for the second pair.
2.
Place part
4
between the two Π shape parts constructed in the former step 1 in order for the frame to be formed.
Screw straight parts
6
(which will be used for the mounting of the support base to the tiles) to the botton part.
Repeat for the rest of the parts.
5.
Bend the straight parts
6
of
step 2 with the hand covering
the beams of the tiled roof.
Drill and fasten up with bolts.
Use level so that the base is
horizontally placed.
3.
Screw the collector supporting part
5
to the bottom part of the frame and
tighten the screws.
4.
Screw the collector supporting part
5
to the top part of the frame without
tightening the screws.
2
1
2
1
1
2
5
5
4
6
4