3. Installation
3.1 Space demand
3.2 Power supply connection
The installation location must offer the socket of A32 CEE
3.3 Transfer paper shredder to installation location
The paper shredder that sent out from factory is not installed totally. The paper
feeding table has removed from the machine and must be installed to the machine on
installation location
--- When transfer the machine, please pay attention to the center of gravity of the
machine
--- Put the machine on a level and steady place
---Open the packing
--- The machine is convenient to be pulled with moving wheels, if it needs to deliver to the
installation location by lift cart, please using appointed cart.
3.3.1 Installation of paper feed table
z
Open the packing
z
Remove the belt which is fixed with screw on paper feeding table.
14