VBA10401-R.3623.A
-
A26
・
-
Outer LCD
Soldering bridges
#613×2
Boss×2
#B2006
・
Attach the outer LCD (#B2006) with 2
screws (#613).
・
Assemble the illumination SW unit by
aligning 2 bosses.
・
Make soldering bridges.
・
Procedure
①
To prevent short circuit, attach the grip (#B26) with the
screw (#631).
②
Connect 2 parts of the main SW FPC unit (#B1011) with
jumpers.
*
2 parts
=
Red line as shown right
i.e. at lower left of the release SW and the 3rd soldering
bridge counting from the bayonet side.
③
Connect the camera and PC with the communication tool
(J61205) and MC-31 (J19109).
(ref. Page A35-A36
)
④
Provide power to camera via AC adapter EH-5.
*
Note: Be careful of short circuit where there is no cover.
⑤
Start up the inspection and adjustment software for
D70 (J18361), and select "INSPECTION AND
ADJUSTMENT FOR AECCD POSITION" then "CCD
ALIGNMENT INSPECTION AND ADJUSTMENT".
⑥
By following instructions on PC, make the position ad-
justment of AECCD by 3 screws.
⑦
Select “CCD SLANT INSPECTION” of the adjustment
software and make an inspection.
⑧
After the adjustment, fix the AECCD by applying Aron
alpha (super glue) slightly.
⑨
Remove the communication tool (J61205).
⑩
Remove the jumper wire of
②
.
⑪
Take out the screw (#631) and grip (#B26).
#B26
#631
#B1011
Y-direction
Adjustable
screw
X-direction
Adjustable
screw
Adhesive: Aron alpha
Lower left of
release SW
3rd soldering bridge count-
ing from bayonet side
Illumination SW unit
Inspection and adjustment of AE CCD Alignment