VBA10401-R.3623.A
-
A14
・
-
Eyepiece unit
Metering FPC unit
Direction for
positioning
①
②
・
Position the metering FPC unit by following the
direction, then attach it lightly with screws (first
①
, then
②
).
Give the screws (
①
and
②
) about 3.5 turns
counterclockwise.
FPC connections
No slack
2 pieces of tape (#709)
Note: Slack here catches the
rear body when it is
attached.
①
②
③
④
#631×2
#B261
・
Attach the eyepiece unit (#B261) with 2 screws
(#631).
Attach the metering FPC unit (#B2008) and the
spring (#290) temporarily with 2 screws (#291).
#B2008
#291×2
#290
#1026
#1025
#B2163
#B1008